

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Trane Blower Coil Air Handler BCHE036DAA10A2
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Fan Wheel Set Screws Check
Safety Precautions
Disconnect all electric power, including remote disconnects, before servicing.
Follow proper lockout/tagout procedures.
Verify that no power is present with a voltmeter.
Fan Wheel Set Screws Check
Check fan wheel set screws whenever a component is removed or an adjustment is made.
Refer to Table 44 for recommendations and note any adjustments made.
6 Monthly Drain Pans Inspection
WARNING: Hazardous Chemicals!
Acknowledge understanding of safety precautions
Pre-Inspection Safety Measures
Wear Personal Protective Equipment (PPE)
Drain Pan and Line Inspection
Is the condensate draining as designed?
Is there evidence of standing water or condensate overflow?
Cleaning Procedure
Disconnect all electrical power to the unit.
Non-Porous Surfaces Cleaning
WARNING: Hazardous Voltage!
Disconnect all electrical power to the unit
Wear appropriate personal protective equipment
Mechanically remove microbial growth
Install a block-off to prevent spray from entering dry sections
Clean contaminated areas with EPA-approved sanitizer
Rinse affected surfaces with fresh water and sponge
Repeat cleaning and rinsing as necessary
Confirm the drain line is open
3 Monthly Unit Check
Warning! Hazardous Service Procedures!
Acknowledge understanding of safety warnings
Pre-Service Safety Procedures
Disconnect all electrical power including remote disconnects
Discharge all energy storing devices such as capacitors
Follow proper lockout/tagout procedures
Fan Wheel Inspection
Manually rotate the fan wheel to check for obstructions
Remove any obstructions and debris from the fan housing
Battery Status Testing
WZS Battery Test
Push the Test button on the WZS sensor
Check LED5 on the sensor for battery strength indication
WDS Battery Test
Push the Test button on the WDS sensor
Check the display for battery life expectancy symbol
Access the parts list for your equipment in MaintainX.
10K NTC Thermistor
X13790374010
10K NTC Thermistor
X13790374010
10K NTC Thermistor
X13790374010
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













