Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Trane Blower Coil Air Handler BCHE012BAA10A2
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Coil Disassembly
Preparation
Ensure the following conditions are met before starting
Is all electrical power disconnected from the unit?
Disconnection
Disconnect piping from coil headers
Remove coil and motor side panels
Is it necessary to remove the opposite side panel for sensor or screw access?
Sensor and Switch Disconnection
Disconnect the following switches and sensors
Porous Surfaces Cleaning
WARNING: Hazardous Voltage!
Disconnect all electrical power to the unit
Wear appropriate personal protective equipment
Use a vacuum device with a HEPA filter to remove accumulated dirt and organic matter
Confirm the drain line is open following the cleaning process
Allow the unit to dry thoroughly before putting it back into service
Replace all panels and parts and restore electrical power to the unit
Ensure no contaminated material contacts other areas of the unit or building
Properly dispose of all contaminated materials and cleaning solution
6 Monthly Fan Sections Inspection
Safety Precautions
Disconnect all electric power, including remote disconnects, before servicing.
Follow proper lockout/tagout procedures to ensure the power cannot be inadvertently energized.
Inspection and Cleaning
Inspect fan sections for evidence of microbial growth (mold).
Is there evidence of microbial growth?
If microbial growth is found, identify and remedy the cause immediately. Refer to 'Troubleshooting' on page 143 for possible causes and solutions.
Wear appropriate personal protective equipment.
Remove any contamination.
Signal Strength Testing
Initiate signal strength test by pressing the Test button on the sensor
Check signal strength indication on Models WZS
Observe LED1, LED2, and LED3 on the sensor for signal strength
Observe LED1, LED2, and LED3 on the receiver for signal strength
Check signal strength indication on Model WDS
Observe test symbols on the sensor display for signal strength
Observe LED1, LED2, and LED3 on the receiver for signal strength
6 Monthly Drain Pans Inspection
WARNING: Hazardous Chemicals!
Acknowledge understanding of safety precautions
Ensure Personal Protective Equipment (PPE) is worn
Drain Pan and Drain Line Inspection
Is the condensate draining as designed?
Is there evidence of standing water or condensate overflow?
Drain Pan Cleaning Procedure
Disconnect all electrical power to the unit
Remove any standing water
Access the parts list for your equipment in MaintainX.
10K NTC Thermistor
X13790374010
10K NTC Thermistor
X13790374010
10K NTC Thermistor
X13790374010
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX