MaintainX Asset Hub logo
EnterprisePricing
Trane

Trane Blower Coil Air Handler BCHE018BAA10A2

Need answers fast?
Explore the manual using AI.

Trane Blower Coil Air Handler BCHE018BAA10A2
Trane Blower Coil Air Handler BCHE018BAA10A2

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Trane Blower Coil Air Handler BCHE018BAA10A2

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Trane Blower Coil Air Handler BCHE018BAA10A2

Trane Blower Coil Air Handler BCHE018BAA10A2

Create an account to install this asset package.

Maintenance Plans for Trane Blower Coil Air Handler Model BCHE018BAA10A2

Integrate maintenance plans directly into your work orders in MaintainX.

ECM Components Replacement

Check mark

Safety Precautions

Check mark

Disconnect all electric power, including remote disconnects and discharge all motor start/run capacitors before servicing.

Check mark

Verify with a CAT III or IV voltmeter rated per NFPA 70E that all capacitors have discharged.

Check mark

Follow proper lockout/tagout procedures to ensure the power cannot be inadvertently energized.

Check mark

Pre-Replacement Guidelines

Check mark

Wait five minutes after power removal to ensure ECM motors' capacitors are discharged.

Check mark

Unplug the motor to ensure no power request.

Check mark

Ensure initial hookups to the CSTI and standard adapter board are made with the power off.

Check mark

Avoid making or removing connections to motors or adapter boards while power is ON.

Run this procedureArrow right

Signal Strength Check

Check mark

Setup

Check mark

Power up a receiver with a 24 V transformer (user supplied)

Check mark

Associate the sensor to a receiver of the same model intended for the job

Check mark

Placement

Check mark

Place the receiver at the desired location

Check mark

Place or hold the sensor at the desired location

Check mark

Testing Signal Strength

Check mark

Press the Test button (S5) on the sensor

Check mark

Observe the signal strength as indicated by LEDs and display

Run this procedureArrow right

1 Weekly Unit Check

Check mark

Safety Warning

Check mark

Read and understand all safety warnings before proceeding with maintenance.

Check mark

Disconnect all electrical power including remote disconnects.

Check mark

Discharge all energy storing devices such as capacitors.

Check mark

Follow proper lockout/tagout procedures.

Check mark

Observe unit for any change in running condition and unusual noise.

Run this procedureArrow right

Fan Wheel Set Screws Check

Check mark

Safety Precautions

Check mark

Disconnect all electric power, including remote disconnects

Check mark

Follow proper lockout/tagout procedures

Check mark

Verify that no power is present with a voltmeter

Check mark

Fan Wheel Set Screws Check

Check mark

Check fan wheel set screws

Check mark

Adjust fan wheel set screws if necessary

Check mark

Refer to Table 44 for recommendations and note any adjustments made

Run this procedureArrow right

Refrigerant Coils Cleaning

Check mark

WARNING: Hazardous Pressures!

Check mark

Disconnect all electrical power to the unit

Check mark

Wear appropriate personal protective equipment and use a soft brush to remove loose debris from both sides of the coil

Check mark

Install a block-off to prevent spray from going through the coil and into a dry section of the unit and/or system ductwork

Check mark

Mix a high-quality coil cleaning detergent with water according to the manufacturer’s instructions

Check mark

Is the detergent strongly alkaline after mixing (PH 8.5 or higher)?

Check mark

Place the mixed solution in a garden pump-up sprayer or high-pressure sprayer

Check mark

If a high pressure sprayer is to be used

Check mark

Maintain minimum nozzle spray angle of 15 degrees

Run this procedureArrow right

Parts for Trane Blower Coil Air Handler BCHE018BAA10A2

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

10K NTC Thermistor

X13790374010

10K NTC Thermistor

X13790374010

10K NTC Thermistor

X13790374010

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Trane

Explore Other Assets