MaintainX Asset Hub logo
EnterprisePricing
Trane

Trane Blower Coil Air Handler BCHE012DAA10A2

Need answers fast?
Explore the manual using AI.

Trane Blower Coil Air Handler BCHE012DAA10A2
Trane Blower Coil Air Handler BCHE012DAA10A2

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Trane Blower Coil Air Handler BCHE012DAA10A2

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Trane Blower Coil Air Handler BCHE012DAA10A2

Trane Blower Coil Air Handler BCHE012DAA10A2

Create an account to install this asset package.

Maintenance Plans for Trane Blower Coil Air Handler Model BCHE012DAA10A2

Integrate maintenance plans directly into your work orders in MaintainX.

6 Monthly Drain Pans Inspection

Check mark

WARNING: Hazardous Chemicals!

Check mark

Acknowledge understanding of safety precautions

Check mark

Pre-Inspection

Check mark

Disconnect all electrical power to the unit

Check mark

Wear appropriate personal protective equipment (PPE)

Check mark

Drain Pan Inspection and Cleaning

Check mark

Check for evidence of standing water or condensate overflow

Check mark

Identify and remedy the cause of standing water or overflow, if any

Check mark

Remove any standing water

Run this procedureArrow right

Signal Strength Check

Check mark

Setup

Check mark

Power up a receiver with a 24 V transformer (user supplied)

Check mark

Associate the sensor to a receiver of the same model intended for the job

Check mark

Placement

Check mark

Place the receiver at the desired location

Check mark

Place or hold the sensor at the desired location

Check mark

Testing Signal Strength

Check mark

Press the Test button (S5) on the sensor

Check mark

Observe the signal strength as indicated by LEDs and display

Run this procedureArrow right

1 Yearly Unit Check

Check mark

Warning! Hazardous Service Procedures!

Check mark

Acknowledge understanding of safety warnings

Check mark

Safety Precautions

Check mark

Disconnect all electrical power including remote disconnects

Check mark

Discharge all energy storing devices such as capacitors

Check mark

Follow proper lockout/tagout procedures

Check mark

Is a qualified licensed electrician present for live electrical work?

Check mark

Unit Inspection and Maintenance

Check mark

Inspect the unit casing for chips and corrosion

Run this procedureArrow right

Signal Strength Testing

Check mark

Initiate signal strength test by pressing the Test button on the sensor

Check mark

Check signal strength indication on Models WZS

Check mark

Observe LED1, LED2, and LED3 on the sensor

Check mark

Observe LED1, LED2, and LED3 on the receiver

Check mark

Check signal strength indication on Model WDS

Check mark

Observe test symbols on the sensor display

Check mark

Observe LED1, LED2, and LED3 on the receiver

Run this procedureArrow right

Coil Disassembly

Check mark

Preparation

Check mark

Ensure the following conditions are met before starting

Check mark

Disconnect all electrical power to the unit

Check mark

Disconnection

Check mark

Disconnect piping from coil headers

Check mark

Remove side panels

Check mark

Is the opposite side panel removal necessary for sensor or screw access?

Check mark

Sensor and Switch Disconnection

Check mark

Disconnect the following switches and sensors

Run this procedureArrow right

Parts for Trane Blower Coil Air Handler BCHE012DAA10A2

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

10K NTC Thermistor

X13790374010

10K NTC Thermistor

X13790374010

10K NTC Thermistor

X13790374010

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Trane

Explore Other Assets