

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Trane Blower Coil Air Handler BCHD036B2A10A2
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Fan Wheel Set Screws Check
Safety Precautions
Disconnect all electric power, including remote disconnects
Follow proper lockout/tagout procedures
Fan Wheel Set Screws Inspection
Check the fan wheel set screws for proper adjustment
Refer to Table 44 for recommendations and note any adjustments made
6 Monthly Drain Pans Inspection
WARNING: Hazardous Chemicals!
Acknowledge understanding of safety precautions
Pre-Inspection Safety Measures
Wear Personal Protective Equipment (PPE)
Disconnect all electrical power to the unit
Drain Pan Inspection and Cleaning
Check for evidence of standing water or condensate overflow
Remove any standing water
Scrape solid matter off of the drain pan
Coil Maintenance
Preparation for Winterization
Identify coil type based on model number
Ensure all coils in the coil section are identified for winterization
Winterization Procedure for Specific Coil Types
Select coil types for winterization
Remove the vent and drain plugs
Blow the coil out with compressed air
Fill and drain the coil several times with full strength glycol
Drain the coil out as completely as possible
Porous Surfaces Cleaning
Safety Precautions
Disconnect all electrical power to the unit
Follow lockout/tagout procedures
Cleaning Process
Wear appropriate personal protective equipment
Use a vacuum device with a HEPA filter to remove dirt and organic matter
Confirm the drain line is open following the cleaning process
Post-Cleaning Procedures
Allow the unit to dry thoroughly before putting it back into service
3 Monthly Equipment Check
Warning! Hazardous Service Procedures!
Acknowledge understanding of safety warnings
Disconnect all electrical power
Follow lockout/tagout procedures
Secure rotor to prevent freewheeling
3 to 6 Month Maintenance Tasks
Manually rotate the fan wheel to check for obstructions
Check motor bracket torque
Inspect coils for dirt build-up
Access the parts list for your equipment in MaintainX.
10K NTC Thermistor
X13790374010
10K NTC Thermistor
X13790374010
10K NTC Thermistor
X13790374010
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













