Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Quincy Compressor 240
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Pressure Switch Adjustment
Preparation
Ensure the compressor is connected to a power supply
Verify that the compressor is not in automatic stand-by mode
Pressure Switch Adjustment
Remove the pressure switch cover
Record the current air pressure reading
Is the compressor running?
Adjust the spring loaded adjustment screw
Record the new air pressure reading
1 Daily Compressor Check
Initial Checks
Check oil level in crankcase
Drain liquid from the air receiver and moisture trap
Startup Procedure
Turn on cooling water (watercooled units)
Jog the starter button and check compressor rotation
Prepare continuous run units for starting by adjusting the pilot valve
Start compressor per factory instructions
Operational Checks
Initial Compressor Inspection
Inspect Compressor Equipment
Inspect compressor equipment for damage during shipment
Was any damage found during inspection?
Carrier Inspection and Claim
Demand an inspection from the carrier if damage is found
Ask the carrier how to file a claim for shipping damages
Refer to SECTION 3, Freight Damage for complete details
Examine Shipping Containers
Examine every carton and crate upon receipt
Initial 100 Hours / 1 Months Oil Change
Pre-Operation Checks
Ensure all necessary parts are in place
Check the lubricant level in the crankcase
Lubricant Replacement
Has the compressor operated for 100 hours or 1 month?
Replace the break-in lubricant with QuinCip lubricant
Post-Operation Checks
Is the lubricant level within the recommended range after replacement?
Verify ambient temperature conditions
1 Daily Air Tank Draining
Preparation
Disconnect & lockout the compressor from the power source (electric models) or disconnect the spark plug wire from the spark plug (gas engine models).
Is the compressor stored in a heated area if subjected to freezing temperatures?
Pressure Reduction
Enter the current air pressure in the tank (PSIG).
Is the air pressure in the tank 30 PSIG or less?
Draining Process
Open the drain valve and allow the moisture and air mixture to drain from the tank.
Close the drain valve once the moisture has been completely drained.
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX