MaintainX Asset Hub logo
EnterprisePricing
Quincy

Quincy Low Pressure Rotary Screw Compressor QSLP 150

Need answers fast?
Explore the manual using AI.

Quincy Low Pressure Rotary Screw Compressor QSLP 150
Quincy Low Pressure Rotary Screw Compressor QSLP 150

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Quincy Low Pressure Rotary Screw Compressor QSLP 150

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Quincy Low Pressure Rotary Screw Compressor QSLP 150

Quincy Low Pressure Rotary Screw Compressor QSLP 150

Create an account to install this asset package.

Maintenance Plans for Quincy Low Pressure Rotary Screw Compressor Model QSLP 150

Integrate maintenance plans directly into your work orders in MaintainX.

Differential Pilot Valve Adjustment

Check mark

Initial Setup

Check mark

Open the manual vent valve to allow the compressor to exhaust air to the outside.

Check mark

Start the unit.

Check mark

Pressure Adjustment

Check mark

Monitor the air pressure as the valve is slowly closed.

Check mark

Enter the desired modulation point pressure (PSIG).

Check mark

Is the air pressure at the desired modulation point (38 PSIG standard)?

Check mark

Differential Pilot Valve Adjustment

Check mark

Adjust the screw on the bottom of the differential pilot valve.

Run this procedureArrow right

Initial 500 Hourly Fluid Filter Replacement

Check mark

Preparation

Check mark

Ensure the equipment is turned off and cooled down

Check mark

Gather necessary tools and replacement filter

Check mark

Filter Replacement

Check mark

Remove the complete cartridge

Check mark

Install the new genuine Quincy replacement filter

Check mark

Post Replacement Check

Check mark

Check for any leaks after replacement

Check mark

Ensure all tools are removed from the work area

Run this procedureArrow right

Air Filter Maintenance

Check mark

Service Interval Check

Check mark

Is the air filter element due for servicing based on ambient conditions?

Check mark

Element Removal and Replacement

Check mark

Unscrew the wing nut to remove the air filter element

Check mark

Exchange the air filter element with a new one

Check mark

Ensure the new element is seated correctly on its mounting base

Check mark

Tighten the wing nut snugly

Check mark

Inspection After Servicing

Check mark

Inspect the filtered air side of the air cleaner canister for dirt

Run this procedureArrow right

Water-cooled Heat Exchangers Cleaning

Check mark

Initial Inspection

Check mark

Inspect cooling water supply for impurities

Check mark

Is there evidence of scale formation or corrosion?

Check mark

Water Treatment Assessment

Check mark

Engage a local water treatment expert to assess water quality

Check mark

Identify necessary water treatment methods

Check mark

Heat Exchanger Tube Cleaning

Check mark

Clean the tube side of the heat exchanger to remove deposits

Check mark

Inspect for overheating or fluid leakage to the water side

Run this procedureArrow right

Shaft Fluid Seal Scavenge System Inspection

Check mark

Scavenge Line Inspection

Check mark

Check that the scavenge line fitting at the bottom of the scavenge line cavity is open and clear

Check mark

Ensure the scavenge line is not plugged

Check mark

Check Valve Performance Inspection

Check mark

Inspect the scavenge line check valve for sticking

Check mark

Is the check valve stuck in the open position?

Check mark

Is the check valve stuck in the closed position?

Check mark

Post Inspection

Check mark

Describe any issues found during inspection

Run this procedureArrow right

Parts for Quincy Low Pressure Rotary Screw Compressor QSLP 150

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Seal Installation Fluid

140902

Seal Installation Fluid

140902

Seal Installation Fluid

140902

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Quincy

Explore Other Assets