

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Quincy Low Pressure Rotary Screw Compressor QSLP 150
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Differential Pilot Valve Adjustment
Initial Setup
Open the manual vent valve to allow the compressor to exhaust air to the outside.
Start the unit.
Pressure Adjustment
Monitor the air pressure as the valve is slowly closed.
Enter the desired modulation point pressure (PSIG).
Is the air pressure at the desired modulation point (38 PSIG standard)?
Differential Pilot Valve Adjustment
Adjust the screw on the bottom of the differential pilot valve.
Initial 500 Hourly Fluid Filter Replacement
Preparation
Ensure the equipment is turned off and cooled down
Gather necessary tools and replacement filter
Filter Replacement
Remove the complete cartridge
Install the new genuine Quincy replacement filter
Post Replacement Check
Check for any leaks after replacement
Ensure all tools are removed from the work area
Air Filter Maintenance
Service Interval Check
Is the air filter element due for servicing based on ambient conditions?
Element Removal and Replacement
Unscrew the wing nut to remove the air filter element
Exchange the air filter element with a new one
Ensure the new element is seated correctly on its mounting base
Tighten the wing nut snugly
Inspection After Servicing
Inspect the filtered air side of the air cleaner canister for dirt
Water-cooled Heat Exchangers Cleaning
Initial Inspection
Inspect cooling water supply for impurities
Is there evidence of scale formation or corrosion?
Water Treatment Assessment
Engage a local water treatment expert to assess water quality
Identify necessary water treatment methods
Heat Exchanger Tube Cleaning
Clean the tube side of the heat exchanger to remove deposits
Inspect for overheating or fluid leakage to the water side
Shaft Fluid Seal Scavenge System Inspection
Scavenge Line Inspection
Check that the scavenge line fitting at the bottom of the scavenge line cavity is open and clear
Ensure the scavenge line is not plugged
Check Valve Performance Inspection
Inspect the scavenge line check valve for sticking
Is the check valve stuck in the open position?
Is the check valve stuck in the closed position?
Post Inspection
Describe any issues found during inspection
Access the parts list for your equipment in MaintainX.
Seal Installation Fluid
140902
Seal Installation Fluid
140902
Seal Installation Fluid
140902
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













