Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Quincy Low Pressure Rotary Screw Compressor QSLP 100
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Shaft Fluid Seal Replacement
Preparation
Ensure you have the complete illustrated instructions from Quincy distributor.
Ensure the work area is clean and free of debris.
Shaft Seal Removal - Triple Lip Type Seal
Remove components
Remove the four bolts and lock washers securing the seal adapter to the suction housing.
Insert two seal adapter retaining bolts into the jack holes and push the seal adapter away from the suction housing.
Inspect components
Use the wear sleeve removal tool to remove the seal wear sleeve.
4000 Hourly / 1 Yearly Air/Fluid Separator Element Replacement
Pre-Replacement Checks
Is the Differential Pressure Indicator showing a need for replacement?
Is there excessive fluid carryover with normal fluid temperature and level?
Has the compressor been running for 4,000 hours or more?
Has it been a year since the last replacement?
Replacement Procedure
Ensure the compressor is turned off and depressurized before starting the replacement.
Carefully remove the old air/fluid separator element without damaging it.
Inspect the old separator element for any signs of damage or punctures.
Water-cooled Heat Exchangers Maintenance
Gasket Replacement
Replace gaskets when removing end castings
Soak gaskets in oil to prevent corrosion and ensure a tight seal
Zinc Anode Inspection
Inspect zinc anodes two weeks after initial startup
Determine future inspection intervals based on corrosion rate
Replace zinc anodes when 70% of the zinc volume is consumed
Water Chamber Draining
Drain water chambers to protect from freezing temperatures
8 Hourly Compressor Check
Gauge and Indicator Monitoring
Record the pressure gauge reading
Record the temperature gauge reading
Are all gauges and indicators showing normal operation?
Fluid Inspection
Check and record the fluid level
Is there any fluid leakage?
Noise and Vibration Check
Is there any unusual noise?
Shaft Fluid Seal Scavenge System Inspection
Scavenge Line Inspection
Check that the scavenge line fitting at the bottom of the scavenge line cavity is open and clear
Ensure the scavenge line is not plugged
Check Valve Performance Inspection
Inspect the scavenge line check valve for sticking
Is the check valve stuck in the open position?
Is the check valve stuck in the closed position?
Post Inspection Actions
Describe any issues found during inspection
Access the parts list for your equipment in MaintainX.
Seal Installation Fluid
140902
Seal Installation Fluid
140902
Seal Installation Fluid
140902
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX