MaintainX Asset Hub logo
EnterprisePricing
Quincy

Quincy Low Pressure Rotary Screw Compressor QSLP 30

Need answers fast?
Explore the manual using AI.

Quincy Low Pressure Rotary Screw Compressor QSLP 30
Quincy Low Pressure Rotary Screw Compressor QSLP 30

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Quincy Low Pressure Rotary Screw Compressor QSLP 30

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Quincy Low Pressure Rotary Screw Compressor QSLP 30

Quincy Low Pressure Rotary Screw Compressor QSLP 30

Create an account to install this asset package.

Maintenance Plans for Quincy Low Pressure Rotary Screw Compressor Model QSLP 30

Integrate maintenance plans directly into your work orders in MaintainX.

Shaft Fluid Seal Scavenge System Inspection

Check mark

Scavenge Line Inspection

Check mark

Check that the scavenge line fitting at the bottom of the scavenge line cavity is open and clear

Check mark

Ensure the scavenge line is not plugged

Check mark

Check Valve Performance Inspection

Check mark

Inspect the scavenge line check valve for sticking

Check mark

Is the check valve stuck in the open position?

Check mark

Is the check valve stuck in the closed position?

Check mark

Post Inspection Actions

Check mark

Describe any issues found during inspection

Run this procedureArrow right

Water-cooled Heat Exchangers Maintenance

Check mark

Gasket Replacement

Check mark

Replace gaskets when removing end castings

Check mark

Soak gaskets in oil to prevent corrosion and ensure a tight seal

Check mark

Zinc Anode Inspection

Check mark

Inspect zinc anodes two weeks after initial startup

Check mark

Determine future inspection intervals based on corrosion rate

Check mark

Replace zinc anodes when 70% of the zinc volume is consumed

Check mark

Water Chamber Draining

Check mark

Drain water chambers to protect from freezing temperatures

Run this procedureArrow right

8 Hourly Compressor Check

Check mark

Gauge and Indicator Monitoring

Check mark

Record all gauge readings

Check mark

Are all indicators showing normal operation?

Check mark

Fluid Inspection

Check mark

Check and record fluid level

Check mark

Is the fluid level within the normal range?

Check mark

Check for fluid leaks

Check mark

Noise and Vibration Check

Check mark

Is there any unusual noise?

Run this procedureArrow right

Fluid Scavenging System Cleaning

Check mark

Orifice Cleaning Conditions

Check mark

Check if cleaning is required due to any of the following conditions

Check mark

Orifice Cleaning Procedure

Check mark

Clean the orifice without reaming or changing its size

Check mark

Ensure the orifice is not installed reversed

Check mark

Scavenger Tube and Line Inspection

Check mark

Inspect the scavenger tube positioned inside the fluid separator element

Check mark

Inspect the copper tube connecting to the compressor

Check mark

For larger models, inspect the following

Run this procedureArrow right

4000 Hourly / 1 Yearly Air/Fluid Separator Element Replacement

Check mark

Pre-Replacement Checks

Check mark

Is the Differential Pressure Indicator showing a need for replacement?

Check mark

Is there excessive fluid carryover with normal fluid temperature and level, and proper scavenging system function?

Check mark

Has it been 4,000 hours since the last replacement?

Check mark

Has it been one year since the last replacement?

Check mark

Replacement Procedure

Check mark

Ensure the compressor is turned off and depressurized before starting the replacement.

Check mark

Carefully remove the old air/fluid separator element without damaging it.

Check mark

Inspect the new separator element for any damage before installation.

Run this procedureArrow right

Parts for Quincy Low Pressure Rotary Screw Compressor QSLP 30

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Seal Installation Fluid

140902

Seal Installation Fluid

140902

Seal Installation Fluid

140902

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Quincy

Explore Other Assets