MaintainX Asset Hub logo
EnterprisePricing
Quincy

Quincy Compressor 350

Need answers fast?
Explore the manual using AI.

Quincy Compressor 350
Quincy Compressor 350

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Quincy Compressor 350

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Quincy Compressor 350

Quincy Compressor 350

Create an account to install this asset package.

Maintenance Plans for Quincy Compressor Model 350

Integrate maintenance plans directly into your work orders in MaintainX.

1 Daily Compressor Check

Check mark

Pre-Start Checks

Check mark

Check oil level in crankcase

Check mark

Drain liquid from the air receiver and moisture trap

Check mark

Turn on cooling water for water-cooled units

Check mark

Starting Procedure

Check mark

Jog the starter button and check compressor rotation

Check mark

Adjust pilot valve for continuous run units if applicable

Check mark

Start compressor per factory instructions

Check mark

Operational Checks

Run this procedureArrow right

1000 Hourly / 6 Monthly Compressor Maintenance

Check mark

Oil Change

Check mark

Is Quin-Cip oil being used?

Check mark

Change oil if 1000 hours or 6 months have passed, whichever occurs first

Check mark

Was the oil changed more frequently due to harsher conditions?

Check mark

Compressor Valve Inspection

Check mark

Inspect compressor valves for leakage

Check mark

Inspect compressor valves for carbon build-up

Check mark

Crankcase and Sump Strainer Cleaning

Check mark

Clean oil sump strainer screen inside the crankcase with safety solvent

Run this procedureArrow right

Initial 100 Hours / 1 Months Oil Change

Check mark

Pre-Operation Checks

Check mark

Verify lubricant status

Check mark

Lubricant Replacement

Check mark

Has the compressor operated for 100 hours or 1 month?

Check mark

Replace break-in lubricant with QuinCip lubricant

Check mark

Consult Quincy Compressor factory for lubricant recommendations if not using QuinCip

Check mark

Post-Operation Checks

Check mark

Verify lubricant properties

Check mark

Environmental Considerations

Run this procedureArrow right

Initial Compressor Inspection

Check mark

Inspect Compressor Equipment

Check mark

Inspect compressor equipment for damage during shipment

Check mark

Was any damage found on the compressor equipment?

Check mark

Carrier Inspection and Claim

Check mark

Demand an inspection from the carrier if damage is found

Check mark

Ask the carrier how to file a claim for shipping damages

Check mark

Refer to SECTION 3, Freight Damage for complete details

Check mark

Examine Shipping Containers

Check mark

Examine every carton and crate upon receipt

Run this procedureArrow right

1 Daily Air Tank Draining

Check mark

Preparation

Check mark

Disconnect & lockout the compressor from the power source (electric models) or disconnect the spark plug wire from the spark plug (gas engine models).

Check mark

Is the compressor stored in a heated area if subjected to freezing temperatures?

Check mark

Pressure Reduction

Check mark

Enter the current air pressure in the tank (PSIG).

Check mark

Is the air pressure in the tank 30 PSIG or less?

Check mark

Draining Process

Check mark

Open the drain valve and allow the moisture and air mixture to drain from the tank.

Check mark

Close the drain valve once the moisture has been completely drained.

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Quincy

Explore Other Assets