Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Pompetravaini Centrifugal Pump TCD
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Initial 50 Hours Oil Change
Preparation
Ensure the engine is off and cooled down
Gather necessary tools and materials (oil, oil-cruet, etc.)
Oil Draining
Remove vent plug of the bearing frame
Dispose of the exhausted oil following current regulations
Oil Filling
Upset the oil-cruet
Pour oil into the bearing frame through the hole of plug till oil is visible in the oil-filler elbow
Packing Seals Adjustment
Adjustment of Packing Seals Without External Flushing
Loosen the stuffing box nuts to allow a strong drip to escape
Verify the extent of the leak (drops per minute)
Tighten the stuffing box nuts progressively until the leak is reduced to a controlled drip
Wait a few minutes and verify the stabilized leak rate (drops per minute)
Is the leak rate within the acceptable range (60-200 drops per minute)?
Measure the temperature of the liquid that comes out
Is the temperature at least 10°C lower than the boiling temperature and below 90°C?
Is the dripping insufficient (high temperature)?
Pipe Cleaning
!CAUTION: Possible contact with hazardous media and hazardous substances, cold or warm. Operate only provided with apposite protective devices.
Pre-Cleaning Safety Measures
Wear appropriate protective devices
Pipe and Reservoir Cleaning
Remove loose materials from piping
Remove foreign particles from reservoirs
Post-Welding Cleaning
Pay particular attention to cleaning welded piping
Ensure components welded are free from debris
Pump And Motor Removal
!DANGER: Danger due to collision, crushing or harm.
Pre-removal Safety Measures
Wait for the complete pump stopping before handling the unit.
Drain the pump or close the pipes by means of a valve to prevent sudden rotation.
Wait for the pump to cool down to avoid contact with high temperature surfaces.
Ensure maintenance is carried out when the pump is at a standstill.
Disconnect the power supply and any other connections.
Ensure power supply is restored only by the operator performing maintenance.
Ensure presence of at least two operators and inform the foreman of maintenance in progress.
Pressure Test
!DANGER: Danger due to fluids in pressure. Carry out sealing tests provided with apposite protective devices.
Pre-Test Setup
Ensure all protective devices are in place
Verify that the installation is complete
Pressure Testing
Record the static pressure in the piping
Is the static pressure within the acceptable range?
Record the vacuum pressure in the piping
Is the vacuum pressure within the acceptable range?
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX