MaintainX Asset Hub logo
EnterprisePricing
Mori Seiki

Mori Seiki CNC Turning Center NL2500SY/700

Need answers fast?
Explore the manual using AI.

Mori Seiki CNC Turning Center NL2500SY/700
Mori Seiki CNC Turning Center NL2500SY/700

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Mori Seiki CNC Turning Center NL2500SY/700

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Mori Seiki CNC Turning Center NL2500SY/700

Mori Seiki CNC Turning Center NL2500SY/700

Create an account to install this asset package.

Maintenance Plans for Mori Seiki CNC Turning Center Model NL2500SY/700

Integrate maintenance plans directly into your work orders in MaintainX.

2000 Hourly Air Filter Element Replacement

Check mark

Precautions when Performing Maintenance Work on Pneumatic Devices

Check mark

Pressure gage inspected and set at the correct value

Check mark

Used a ladder or service platform when working in elevated places

Check mark

Air Filter Inspection and Element Replacement

Check mark

Main power turned OFF

Check mark

Valve turned CW to shut off the compressed air supply

Check mark

Manual drain cock turned in the counterclockwise direction to release residual pressure

Check mark

Pressure gage reading after releasing residual pressure

Check mark

Air filter element inspected/replaced

Run this procedureArrow right

1000 Hourly V-Belt Inspection

Check mark

19 HIGH PRESSURE COOLANT UNIT (OPTION)

Check mark

WARNING

Check mark

1. Do not operate the high pressure coolant unit or perform maintenance and inspections without reading and obtaining a thorough understanding of the contents of the operation manual provided with the high pressure coolant unit.

Check mark

2. Keep the high pressure coolant unit operation manual on hand to enable immediate reference.

Check mark

3. After the completion of the maintenance and inspections, remount all covers before running the machine.

Check mark

19-5 High Pressure Pump Oil Replacement and V-Belt Inspection

Check mark

<Procedure>

Check mark

1) Remove the rear cover.

Check mark

WARNING

Run this procedureArrow right

1 Yearly Batteries Replacement

Check mark

17 ELECTRICAL CABINET

Check mark

17-4 Replacing Batteries

Check mark

CAUTION

Check mark

1. Change the NC memory back-up battery and servo absolute position sensing battery with power supplied to the NC.

Check mark

2. Before changing the batteries, save the memory data such as parameters and programs as backup in an external I/O device such as a memory card or USB memory.

Check mark

3. Always ensure that the polarity of the batteries is correct.

Check mark

<Procedure>

Check mark

Function selection key (SYSTEM) → [PERIODIC INSPECT.]

Check mark

Confirm 'BATTERY REPLACEMENT' accumulate time.

Run this procedureArrow right

1 Daily Spindle Warm-Up

Check mark

CAUTION: Do not rotate the spindle without a workpiece clamped in the chuck.

Check mark

Is a well-balanced workpiece, as small in diameter as possible, clamped in the chuck with the usual chucking pressure?

Check mark

Is the spindle warm-up performed below the maximum permissible rotation speed of the chuck, workpiece, and fixture?

Check mark

Are the chuck, workpiece, fixture, and tool mounted securely before performing the spindle warm-up?

Check mark

Is the rotary tool-spindle warm-up performed at or below the maximum permissible rotation speed of tool holder?

Check mark

Is the tool to be mounted on the rotary tool-spindle a small diameter tool that can be rotated at the maximum spindle speed or more?

Check mark

NOTE: Adjust the rotation speed for warm-up based on the maximum rotation speed for the machining programs used for the day.

Check mark

Enter the rotation speed for warm-up

Check mark

Sign off on the daily spindle warm-up

Run this procedureArrow right

300 Hourly Notch Clean Filter Cleaning

Check mark

19 HIGH PRESSURE COOLANT UNIT (OPTION)

Check mark

WARNING

Check mark

1. Do not operate the high pressure coolant unit or perform maintenance and inspections without reading and obtaining a thorough understanding of the contents of the operation manual provided with the high pressure coolant unit.

Check mark

2. Keep the high pressure coolant unit operation manual on hand to enable immediate reference.

Check mark

3. After the completion of the maintenance and inspections, remount all covers before running the machine.

Check mark

19-2 Cleaning Notch Clean Filter

Check mark

<Procedure>

Check mark

1) Turn the handle in the arrow direction several times.

Check mark

2) In order to drain coolant, hold the valve halfway open when the machine is running and hold the valve fully open when the machine is not running.

Run this procedureArrow right

Parts for Mori Seiki CNC Turning Center NL2500SY/700

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Hydraulic Unit EHU25-L04-A-30-127C

U00531A

Valve Unit V-Nl-EA01

U00536A

Valve Unit V-NL-EA02

U00537A

Chuck Unit Bt-102-50-S, UK4273-1

U00532A

Chuck Unit Bt-202-50-S, UK4276-1

U00530B

Hydraulic Unit EHU25-L04-A-30-127C

U00531A

Valve Unit V-Nl-EA01

U00536A

Valve Unit V-NL-EA02

U00537A

Chuck Unit Bt-102-50-S, UK4273-1

U00532A

Chuck Unit Bt-202-50-S, UK4276-1

U00530B

Hydraulic Unit EHU25-L04-A-30-127C

U00531A

Valve Unit V-Nl-EA01

U00536A

Valve Unit V-NL-EA02

U00537A

Chuck Unit Bt-102-50-S, UK4273-1

U00532A

Chuck Unit Bt-202-50-S, UK4276-1

U00530B

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Mori Seiki

Explore Other Assets