

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Mori Seiki CNC Turning Center NL2500SY/700
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
2000 Hourly Air Filter Element Replacement
Precautions when Performing Maintenance Work on Pneumatic Devices
Pressure gage inspected and set at the correct value
Used a ladder or service platform when working in elevated places
Air Filter Inspection and Element Replacement
Main power turned OFF
Valve turned CW to shut off the compressed air supply
Manual drain cock turned in the counterclockwise direction to release residual pressure
Pressure gage reading after releasing residual pressure
Air filter element inspected/replaced
1000 Hourly V-Belt Inspection
19 HIGH PRESSURE COOLANT UNIT (OPTION)
WARNING
1. Do not operate the high pressure coolant unit or perform maintenance and inspections without reading and obtaining a thorough understanding of the contents of the operation manual provided with the high pressure coolant unit.
2. Keep the high pressure coolant unit operation manual on hand to enable immediate reference.
3. After the completion of the maintenance and inspections, remount all covers before running the machine.
19-5 High Pressure Pump Oil Replacement and V-Belt Inspection
<Procedure>
1) Remove the rear cover.
WARNING
1 Yearly Batteries Replacement
17 ELECTRICAL CABINET
17-4 Replacing Batteries
CAUTION
1. Change the NC memory back-up battery and servo absolute position sensing battery with power supplied to the NC.
2. Before changing the batteries, save the memory data such as parameters and programs as backup in an external I/O device such as a memory card or USB memory.
3. Always ensure that the polarity of the batteries is correct.
<Procedure>
Function selection key (SYSTEM) → [PERIODIC INSPECT.]
Confirm 'BATTERY REPLACEMENT' accumulate time.
1 Daily Spindle Warm-Up
CAUTION: Do not rotate the spindle without a workpiece clamped in the chuck.
Is a well-balanced workpiece, as small in diameter as possible, clamped in the chuck with the usual chucking pressure?
Is the spindle warm-up performed below the maximum permissible rotation speed of the chuck, workpiece, and fixture?
Are the chuck, workpiece, fixture, and tool mounted securely before performing the spindle warm-up?
Is the rotary tool-spindle warm-up performed at or below the maximum permissible rotation speed of tool holder?
Is the tool to be mounted on the rotary tool-spindle a small diameter tool that can be rotated at the maximum spindle speed or more?
NOTE: Adjust the rotation speed for warm-up based on the maximum rotation speed for the machining programs used for the day.
Enter the rotation speed for warm-up
Sign off on the daily spindle warm-up
300 Hourly Notch Clean Filter Cleaning
19 HIGH PRESSURE COOLANT UNIT (OPTION)
WARNING
1. Do not operate the high pressure coolant unit or perform maintenance and inspections without reading and obtaining a thorough understanding of the contents of the operation manual provided with the high pressure coolant unit.
2. Keep the high pressure coolant unit operation manual on hand to enable immediate reference.
3. After the completion of the maintenance and inspections, remount all covers before running the machine.
19-2 Cleaning Notch Clean Filter
<Procedure>
1) Turn the handle in the arrow direction several times.
2) In order to drain coolant, hold the valve halfway open when the machine is running and hold the valve fully open when the machine is not running.
Access the parts list for your equipment in MaintainX.
Hydraulic Unit EHU25-L04-A-30-127C
U00531A
Valve Unit V-Nl-EA01
U00536A
Valve Unit V-NL-EA02
U00537A
Chuck Unit Bt-102-50-S, UK4273-1
U00532A
Chuck Unit Bt-202-50-S, UK4276-1
U00530B
Hydraulic Unit EHU25-L04-A-30-127C
U00531A
Valve Unit V-Nl-EA01
U00536A
Valve Unit V-NL-EA02
U00537A
Chuck Unit Bt-102-50-S, UK4273-1
U00532A
Chuck Unit Bt-202-50-S, UK4276-1
U00530B
Hydraulic Unit EHU25-L04-A-30-127C
U00531A
Valve Unit V-Nl-EA01
U00536A
Valve Unit V-NL-EA02
U00537A
Chuck Unit Bt-102-50-S, UK4273-1
U00532A
Chuck Unit Bt-202-50-S, UK4276-1
U00530B
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













