MaintainX Asset Hub logo
EnterprisePricing
Mazak

Mazak Vertical Machining Center Nexus 410B-II HS

Need answers fast?
Explore the manual using AI.

Mazak Vertical Machining Center Nexus 410B-II HS
Mazak Vertical Machining Center Nexus 410B-II HS

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Mazak Vertical Machining Center Nexus 410B-II HS

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Mazak Vertical Machining Center Nexus 410B-II HS

Mazak Vertical Machining Center Nexus 410B-II HS

Create an account to install this asset package.

Maintenance Plans for Mazak Vertical Machining Center Model Nexus 410B-II HS

Integrate maintenance plans directly into your work orders in MaintainX.

X-Axis Way Cover Maintenance

Check mark

WARNING: Always switch off the main power disconnect switch and lock it before carrying out any maintenance work.

Check mark

Maintenance of electrical equipment must be carried out by qualified licensed electrical engineers only.

Check mark

When carrying out maintenance in high places, always use a suitable ladder or a service platform and always wear a helmet.

Check mark

Do not start the machine until all of the covers removed for maintenance have been refitted.

Check mark

Wipe up any water or oil spills immediately, and keep the maintenance area and the workplace clean and tidy at all times.

Check mark

Maintenance work should be carried out by qualified personnel in accordance with the instructions of the person in charge.

Check mark

Use only the specified grades of hydraulic oil, lubricating oil, and grease or their equivalents.

Check mark

Check the results of maintenance work in the presence of the person in charge.

Check mark

Stop all machine operation before cleaning the machine or the surrounding area.

Run this procedureArrow right

1 Daily Vertical Machining Center Cleaning

Check mark

WARNING: Always switch off the main power disconnect switch and lock it before carrying out any maintenance work.

Check mark

Maintenance of electrical equipment must be carried out by qualified licensed electrical engineers only.

Check mark

When carrying out maintenance in high places, always use a suitable ladder or a service platform and always wear a helmet.

Check mark

Do not start the machine until all of the covers removed for maintenance have been refitted.

Check mark

Wipe up any water or oil spills immediately, and keep the maintenance area and the workplace clean and tidy at all times.

Check mark

Maintenance work should be carried out by qualified personnel in accordance with the instructions of the person in charge.

Check mark

Do not use compressed air to clean the machine or to remove chips.

Check mark

Always use gloves when clearing away chips; never touch chips with bare hands.

Check mark

Use only the specified grades of hydraulic oil, lubricating oil, and grease or their equivalents.

Run this procedureArrow right

1500 Hourly / 6 Monthly Spinle Lubricating Unit Filter Cleaning

Check mark

WARNING: Always switch off the main power disconnect switch and lock it before carrying out any maintenance work. This will eliminate the possibility of the machinery being accidentally started by someone else.

Check mark

After the power has been switched off for a short while, check the voltage with a multimeter or similar instrument to make sure that there is no residual voltage. Also discharge the capacitors.

Check mark

Maintenance of electrical equipment must be carried out by qualified licensed electrical engineers only.

Check mark

Do not remove or modify limit switches, proximity switches, or other safety devices.

Check mark

When carrying out maintenance in high places, always use a suitable ladder or a service platform and always wear a helmet.

Check mark

Always switch off the main power disconnect switch and lock it before replacing bulbs or other electrical equipment, and use products with the same specifications as the original.

Check mark

Do not start the machine until all of the covers removed for maintenance have been refitted.

Check mark

Wipe up any water or oil spills immediately, and keep the maintenance area and the workplace clean and tidy at all times.

Check mark

Be absolutely certain to use the specified and standardized parts as replacement or consumable parts so as to maintain the as-shipped machine specifications. We take no responsibility for any personal accidents or machine trouble due to inobservance of this warning

Run this procedureArrow right

1500 Hourly / 6 Monthly Grease Level Adjustment

Check mark

WARNING:

Check mark

- Always switch off the main power disconnect switch and lock it before carrying out any maintenance work. This will eliminate the possibility of the machinery being accidentally started by someone else.

Check mark

- After the power has been switched off for a short while, check the voltage with a multimeter or similar instrument to make sure that there is no residual voltage. Also discharge the capacitors.

Check mark

- Maintenance of electrical equipment must be carried out by qualified licensed electrical engineers only.

Check mark

- Do not remove or modify limit switches, proximity switches, or other safety devices.

Check mark

- When carrying out maintenance in high places, always use a suitable ladder or a service platform and always wear a helmet.

Check mark

- Always switch off the main power disconnect switch and lock it before replacing bulbs or other electrical equipment, and use products with the same specifications as the original.

Check mark

- Do not start the machine until all of the covers removed for maintenance have been refitted.

Check mark

- Wipe up any water or oil spills immediately, and keep the maintenance area and the workplace clean and tidy at all times.

Run this procedureArrow right

Y-Axis Way Cover Maintenance

Check mark

WARNING: Always switch off the main power disconnect switch and lock it before carrying out any maintenance work.

Check mark

Maintenance of electrical equipment must be carried out by qualified licensed electrical engineers only.

Check mark

When carrying out maintenance in high places, always use a suitable ladder or a service platform and always wear a helmet.

Check mark

Do not start the machine until all of the covers removed for maintenance have been refitted.

Check mark

Wipe up any water or oil spills immediately, and keep the maintenance area and the workplace clean and tidy at all times.

Check mark

Maintenance work should be carried out by qualified personnel in accordance with the instructions of the person in charge.

Check mark

Use only the specified grades of hydraulic oil, lubricating oil, and grease or their equivalents.

Check mark

Check the results of maintenance work in the presence of the person in charge.

Check mark

Stop all machine operation before cleaning the machine or the surrounding area.

Run this procedureArrow right

Parts for Mazak Vertical Machining Center Nexus 410B-II HS

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Line Filter, G-AK-12-50μk

G30TP002450

Scraper, SK-G-AK-12

G30TP00245A

Element, P-G-AK-12-50μk

G30TP00245B

Packing, T2 × φ17 (0.67)/φ8.5 (0.33)

G30TP00245C

O-Ring P-14, For Drain Plug

J2600P01400

Line Filter, G-AK-12-50μk

G30TP002450

Scraper, SK-G-AK-12

G30TP00245A

Element, P-G-AK-12-50μk

G30TP00245B

Packing, T2 × φ17 (0.67)/φ8.5 (0.33)

G30TP00245C

O-Ring P-14, For Drain Plug

J2600P01400

Line Filter, G-AK-12-50μk

G30TP002450

Scraper, SK-G-AK-12

G30TP00245A

Element, P-G-AK-12-50μk

G30TP00245B

Packing, T2 × φ17 (0.67)/φ8.5 (0.33)

G30TP00245C

O-Ring P-14, For Drain Plug

J2600P01400

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Mazak

Explore Other Assets