

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Mazak Computer Numerical Control Machine QTN 450 M
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Machine Warm-Up
CAUTION: Warm up the machine, especially the spindle and feed shaft, by running the machine for 10 to 20 minutes at about one-half or one-third the maximum speed in the automatic operation mode.
Did the automatic operation program cause each machine component to operate?
Did you check the operations of each machine component?
Be particularly careful to warm up the spindle which can turn above 4000 rpm. If the machine is used for actual machining immediately after being started up following a long idle period, the sliding parts may be worn due to the lack of oil.
Also, thermal expansion of the machine components can jeopardize machining accuracy. To prevent this condition, always make sure that the machine is warmed up.
Sign off on the machine warm-up
Machine Maintenance
Check the coolant for contamination
Check the hydraulic oils for contamination
Check the lubricants for contamination
Change the coolant if seriously contaminated
Change the hydraulic oils if seriously contaminated
Change the lubricants if seriously contaminated
Check the coolant level
Check the hydraulic oil level
Check the lubricant level
Machine Inspection
WARNING: When checking belt tensions, do not get your fingers caught between the belt and pulley.
CAUTION:
Check pressure gages for proper readings.
Check motors, gear boxes and other parts for abnormal noises.
Check the motor lubrication, and sliding parts for evidence of proper lubrication.
Check safety covers and safety devices for proper operation.
Check belt tensions. Replace any set of belts that have become stretched with a fresh matching set.
Sign off on the machine inspection
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













