MaintainX Asset Hub logo
EnterprisePricing
Mazak

Mazak Vertical Machining Center Nexus 530C-II DM

Need answers fast?
Explore the manual using AI.

Mazak Vertical Machining Center Nexus 530C-II DM
Mazak Vertical Machining Center Nexus 530C-II DM

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Mazak Vertical Machining Center Nexus 530C-II DM

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Mazak Vertical Machining Center Nexus 530C-II DM

Mazak Vertical Machining Center Nexus 530C-II DM

Create an account to install this asset package.

Maintenance Plans for Mazak Vertical Machining Center Model Nexus 530C-II DM

Integrate maintenance plans directly into your work orders in MaintainX.

Initial Vertical Machining Center Cleaning

Check mark

Warning: Do not operate the machine before cleaning

Check mark

Presence of rust preventive oil on slideways and other machine parts

Check mark

Upload a photo of the machine before cleaning

Check mark

Remove rust preventive oil with rag soaked with washing oil

Check mark

Successful removal of rust preventive oil

Check mark

Upload a photo of the machine after cleaning

Check mark

Note: Take care to avoid entry of cleaning oil into the slideway surfaces passing the wiper

Check mark

Sign off on the initial cleaning of the Vertical Machining Center

Run this procedureArrow right

250 Hourly / 1 Monthly High-Pressure Coolant Line Filter Element Replacement

Check mark

WARNING: Always switch off the main power disconnect switch and lock it before carrying out any maintenance work.

Check mark

Maintenance of electrical equipment must be carried out by qualified licensed electrical engineers only.

Check mark

When carrying out maintenance in high places, always use a suitable ladder or a service platform and always wear a helmet.

Check mark

Do not start the machine until all of the covers removed for maintenance have been refitted.

Check mark

Maintenance work should be carried out by qualified personnel in accordance with the instructions of the person in charge.

Check mark

Use only the specified grades of hydraulic oil, lubricating oil, and grease or their equivalents.

Check mark

Follow the instructions on the instruction plate concerning the brands of oil to be used, lubrication points, amount to be used, and oil change intervals.

Check mark

Stop all machine operation before cleaning the machine or the surrounding area.

Check mark

Stop the through-spindle coolant and after confirming that coolant does not flow, remove the drain plug to completely empty the filter by draining coolant.

Run this procedureArrow right

1500 Hourly / 6 Monthly ATC Unit Hydraulic Oil Change

Check mark

WARNING: Always switch off the main power disconnect switch and lock it before carrying out any maintenance work.

Check mark

Maintenance of electrical equipment must be carried out by qualified licensed electrical engineers only.

Check mark

When carrying out maintenance in high places, always use a suitable ladder or a service platform and always wear a helmet.

Check mark

Do not start the machine until all of the covers removed for maintenance have been refitted.

Check mark

Maintenance work should be carried out by qualified personnel in accordance with the instructions of the person in charge.

Check mark

Use only the specified grades of hydraulic oil, lubricating oil, and grease or their equivalents.

Check mark

Follow the instructions on the instruction plate concerning the brands of oil to be used, lubrication points, amount to be used, and oil change intervals.

Check mark

Stop all machine operation before cleaning the machine or the surrounding area.

Check mark

Shut off the power before changing the hydraulic oil.

Run this procedureArrow right

1500 Hourly / 6 Monthly Grease Level Adjustment

Check mark

WARNING:

Check mark

- Always switch off the main power disconnect switch and lock it before carrying out any maintenance work. This will eliminate the possibility of the machinery being accidentally started by someone else.

Check mark

- After the power has been switched off for a short while, check the voltage with a multimeter or similar instrument to make sure that there is no residual voltage. Also discharge the capacitors.

Check mark

- Maintenance of electrical equipment must be carried out by qualified licensed electrical engineers only.

Check mark

- Do not remove or modify limit switches, proximity switches, or other safety devices.

Check mark

- When carrying out maintenance in high places, always use a suitable ladder or a service platform and always wear a helmet.

Check mark

- Always switch off the main power disconnect switch and lock it before replacing bulbs or other electrical equipment, and use products with the same specifications as the original.

Check mark

- Do not start the machine until all of the covers removed for maintenance have been refitted.

Check mark

- Wipe up any water or oil spills immediately, and keep the maintenance area and the workplace clean and tidy at all times.

Run this procedureArrow right

3000 Hourly / 1 Yearly Vertical Machining Center Maintenance

Check mark

WARNING: Always switch off the main power disconnect switch and lock it before carrying out any maintenance work.

Check mark

WARNING: Maintenance of electrical equipment must be carried out by qualified licensed electrical engineers only.

Check mark

WARNING: When carrying out maintenance in high places, always use a suitable ladder or a service platform and always wear a helmet.

Check mark

WARNING: Do not start the machine until all of the covers removed for maintenance have been refitted.

Check mark

WARNING: Be absolutely certain to use the specified and standardized parts as replacement or consumable parts.

Check mark

WARNING: Maintenance work should be carried out by qualified personnel in accordance with the instructions of the person in charge.

Check mark

WARNING: Do not use compressed air to clean the machine or to remove chips.

Check mark

WARNING: Use only the specified grades of hydraulic oil, lubricating oil, and grease or their equivalents.

Check mark

WARNING: When changing a fuse, check that the new fuse has the correct rating.

Run this procedureArrow right

Parts for Mazak Vertical Machining Center Nexus 530C-II DM

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Line Filter, G-AK-12-50μk

G30TP002450

Scraper, SK-G-AK-12

G30TP00245A

Element, P-G-AK-12-50μk

G30TP00245B

Packing, T2 × φ17 (0.67)/φ8.5 (0.33)

G30TP00245C

O-Ring P-14, For Drain Plug

J2600P01400

Line Filter, G-AK-12-50μk

G30TP002450

Scraper, SK-G-AK-12

G30TP00245A

Element, P-G-AK-12-50μk

G30TP00245B

Packing, T2 × φ17 (0.67)/φ8.5 (0.33)

G30TP00245C

O-Ring P-14, For Drain Plug

J2600P01400

Line Filter, G-AK-12-50μk

G30TP002450

Scraper, SK-G-AK-12

G30TP00245A

Element, P-G-AK-12-50μk

G30TP00245B

Packing, T2 × φ17 (0.67)/φ8.5 (0.33)

G30TP00245C

O-Ring P-14, For Drain Plug

J2600P01400

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Mazak

Explore Other Assets