Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Maguire Weigh Scale Blender WSB-444
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Slide Valves And Mix Chamber Inspection
Slide Valves Inspection
Test slide valve movement during LOTO without air pressure
Check for wear on the slide valve guide rods
Check cylinder clevis adjustment for correct closing of the valve
Check the clevis pin connecting the air cylinder for wear
Mix Chamber Inspection
Inspect mix blades for damage or wear
Replace damaged, worn, or sharp mix blades
6 Monthly Load Cell Zero And Full Weight Calibration
Pre-Calibration Checks
Ensure the weigh bin is empty.
Verify the load cell cable is plugged into the side of the controller.
Ensure the weigh bin is resting on the load cells freely and does not make contact with anything around it.
Check that the air line to the weigh bin’s dump valve is connected as it would be during normal operation.
Ensure the load cells and bin are not jammed. Test by lightly touching the bin and observing the display change.
Zero Weight Calibration
Is *47 disabled on the WSD?
Perform zero weight calibration routine.
Load Cell Maintenance
Load Cell Inspection
Check the physical condition of the load cell components
Inspect for any visible damage or corrosion
Zero Calibration
Record the current zero reading
Is the zero reading within acceptable range?
Full Weight Calibration
Record the full weight reading
Is the full weight reading within acceptable range?
Weigh Scale Blender Maintenance
Pneumatic and Electrical Lockout/Tagout (LOTO)
Ensure blender is pneumatically and electrically locked out
Disconnect compressed air supply
Is the pneumatic valve actuator manually operated?
Use lockout/tagout valve for pneumatic lockout/tagout if applicable
Disconnect blender from air supply if directly connected
Dissipate stored/residual energy from pneumatic system using Manual Operations screen
Disconnect electric supply
Is the blender equipped with an electrical LOTO box?
Level Sensor Adjustment
Adjusting Sensor Sensitivity
Locate the adjustment screw at the rear of the sensor
Use a very small regular screwdriver for adjustment
Turn the adjustment screw clockwise until the LED turns ON
Turn the adjustment screw counter-clockwise until the LED turns OFF
Continue turning counter-clockwise for one full revolution after the LED turns off
Does the LED turn on when material is present in front of the sensor?
Note any additional adjustments made due to material dust or static
Sensor Position Adjustment (200 and 400 Series Models Only)
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX