MaintainX Asset Hub logo
EnterprisePricing
Mac-Lander

Mac-Lander Flatbed Trailer 18TFMWB

Need answers fast?
Explore the manual using AI.

Mac-Lander Flatbed Trailer 18TFMWB
Mac-Lander Flatbed Trailer 18TFMWB

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Mac-Lander Flatbed Trailer 18TFMWB

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Mac-Lander Flatbed Trailer 18TFMWB

Mac-Lander Flatbed Trailer 18TFMWB

Create an account to install this asset package.

Maintenance Plans for Mac-Lander Flatbed Trailer Model 18TFMWB

Integrate maintenance plans directly into your work orders in MaintainX.

Flatbed Trailer Lights Maintenance

Check mark

Initial Light Check

Check mark

Ensure tow unit lights are on

Check mark

Are all trailer lights operational?

Check mark

Detailed Light Inspection

Check mark

Check operation of the following lights

Check mark

Inspect condition of reflector lenses

Check mark

Maintenance Actions

Check mark

Replace damaged or inoperative bulbs

Check mark

Replace damaged lenses

Run this procedureArrow right

1 Monthly Flatbed Trailer Lug Nut Adjustment

Check mark

Hand tighten lug nuts

Check mark

Initial tightening to 15-20 lbs using cross tightening sequence

Check mark

Final tightening to 80-90 ft. lbs for 1/2 studs

Check mark

Retorque after first 50 miles of use

Check mark

Retorque monthly

Run this procedureArrow right

Flatbed Trailer Inspection

Check mark

Pre-Trip Inspection

Check mark

Inspect all nuts and bolts for tightness

Check mark

Load trailer on a flat and level surface

Check mark

Tire and Brake Check

Check mark

Check tire pressure

Check mark

Is the tire pressure at the specified level?

Check mark

Are the brakes working properly?

Check mark

Load and Electrical Check

Check mark

Is the load properly secured and not overloaded?

Run this procedureArrow right

Flatbed Trailer Tires Check

Check mark

Tire Inspection

Check mark

Check and record tire pressure for each tire

Check mark

Inspect tires for wear and damage

Check mark

Wheel and Lug Nut Check

Check mark

Check and record torque levels of wheel’s lug nuts

Check mark

Tire Changing Safety

Check mark

Block and secure trailer before changing a tire

Check mark

Ensure jack capacity matches trailer weight

Check mark

Change tires off traveled portion of roadway

Run this procedureArrow right

Flatbed Trailer Battery Maintenance

Check mark

Break-away System Inspection

Check mark

Ensure wiring and connections are secure

Check mark

Battery Charging

Check mark

Is the battery charged periodically?

Check mark

Describe any issues found during charging

Check mark

Safety Precautions

Check mark

Wear protective gear when handling the battery

Check mark

Is the battery free from acid leaks?

Check mark

Is the area well-ventilated to prevent gas accumulation?

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Mac-Lander

Explore Other Assets