MaintainX, an Autodesk company
EnterprisePricing
Lochinvar

Lochinvar Water Heater CGL250065

Need answers fast?
Explore the manual using AI.

Lochinvar Water Heater CGL250065
Lochinvar Water Heater CGL250065

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Lochinvar Water Heater CGL250065

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Lochinvar Water Heater CGL250065

Lochinvar Water Heater CGL250065

Create an account to install this asset package.

Maintenance Plans for Lochinvar Water Heater Model CGL250065

Integrate maintenance plans directly into your work orders in MaintainX.

Input Check

Check mark

Attach a pressure gauge or a manometer to the gauge port

Check mark

Enter the manifold pressure from Table 5

Check mark

Calculate the actual heater input using the formula (3600 / T) X H = Btuh

Check mark

Is the calculated Btuh within the acceptable range?

Check mark

Remove the regulator adjustment sealing cap

Check mark

Adjust the gas pressure by turning the adjusting screw

Check mark

Clock the meter again to verify the input rate

Check mark

Repeat adjustment and clocking until the specified input rate is achieved

Check mark

Turn the gas control knob to PILOT

Run this procedureArrow right

Initial Water Heater Adjustment

Check mark

Check manifold and inlet gas pressures

Check mark

Adjust pilot flame

Check mark

Follow 'Pilot Burner' procedure under 'Preventive Maintenance'

Run this procedureArrow right

1 Yearly Relief Valve Check

Check mark

Valve Operation Check

Check mark

Lift the lever at the top of the valve several times until the valve seats properly and operates freely.

Check mark

Check operation of other relief valves if present

Check mark

Safety Precautions

Check mark

Ensure safe discharge of hot water to prevent water damage.

Check mark

Did the temperature and pressure relief valve discharge periodically or continuously?

Check mark

Problem Identification and Resolution

Check mark

Describe any issues observed with the valve operation.

Check mark

Is there unusually high water temperature or pressure in the system?

Run this procedureArrow right

Initial 6 Months Water Heater Inspection

Check mark

Lime Buildup Measurement

Check mark

Measure the depth of lime buildup in the heater

Check mark

Record the depth of lime buildup in inches

Check mark

Deliming Schedule Recommendation

Check mark

Determine deliming frequency based on lime buildup

Check mark

Safety Precautions

Check mark

Review handling instructions on the deliming product label

Check mark

Post Inspection

Check mark

Is the water heater functioning efficiently?

Run this procedureArrow right

Venting Check

Check mark

Initial Setup

Check mark

Seal any unused openings in the venting system

Check mark

Inspect the venting system for proper size and horizontal pitch

Check mark

Check for blockage, restriction, leakage, corrosion, and other deficiencies

Check mark

Building Preparation

Check mark

Close all building doors and windows

Check mark

Close all doors between the water heater space and other spaces

Check mark

Turn on all appliances not connected to the venting system

Check mark

Turn on all exhaust fans at maximum speed

Run this procedureArrow right

Parts for Lochinvar Water Heater CGL250065

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Pilot Burner, Natural Gas

9004541215

Pilor Burner, Propane Gas

9004542215

Nipple Collars

74060

Leg Kit

9003425205

Plate Gasket

9004099215

Pilot Burner, Natural Gas

9004541215

Pilor Burner, Propane Gas

9004542215

Nipple Collars

74060

Leg Kit

9003425205

Plate Gasket

9004099215

Pilot Burner, Natural Gas

9004541215

Pilor Burner, Propane Gas

9004542215

Nipple Collars

74060

Leg Kit

9003425205

Plate Gasket

9004099215

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Lochinvar

Explore Other Assets