MaintainX Asset Hub logo
EnterprisePricing
Ingersoll Rand

Ingersoll Rand Compressor R37

Need answers fast?
Explore the manual using AI.

Ingersoll Rand Compressor R37
Ingersoll Rand Compressor R37

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Ingersoll Rand Compressor R37

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Ingersoll Rand Compressor R37

Ingersoll Rand Compressor R37

Create an account to install this asset package.

Maintenance Plans for Ingersoll Rand Compressor Model R37

Integrate maintenance plans directly into your work orders in MaintainX.

6000 Hourly Compressor Maintenance

Check mark

Replace Food-grade Lubricant (Ultra FG)

Check mark

Replace Separator element (if using Food-grade Lubricant)

Check mark

Check the separator differential pressure via the controller

Check mark

Changing Separator Element for R30-37

Check mark

Stop the machine, electrically isolate and vent all trapped pressure

Check mark

Loosen separator cartridges with the correct tool

Check mark

Remove the cartridges from the housing; place in a sealed bag and dispose of safely

Check mark

Clean the mating faces of the housing

Check mark

Remove the new Ingersoll Rand replacement cartridges from protective package

Run this procedureArrow right

4000 Hourly / 6 Monthly Compressor Maintenance

Check mark

Scavenge Screen Inspection

Check mark

Scavenge screen blockage?

Check mark

Scavenge Screen/Orifice Removal

Check mark

Scavenge line tubing disconnected from each end?

Check mark

Exit end of the assembly removed without damage to the screen or sealing surfaces?

Check mark

All parts cleaned and inspected prior to reinstallation?

Check mark

Assembly installed with correct direction of flow?

Check mark

Air Filter Element Replacement

Check mark

Retaining cap checked for dirt and debris and wiped clean?

Run this procedureArrow right

8000 Hourly / 1 Yearly Compressor Maintenance

Check mark

Replace Separator element

Check mark

Replace No-loss condensate drain service module

Check mark

Service Minimum pressure check valve (MPCV) service kit

Check mark

The minimum pressure check valve (MPCV) shall be frequently tested and regularly maintained. Remove it from the compressor for testing. If operating conditions are particularly severe, the frequency of testing and maintenance shall be increased accordingly.

Check mark

The user shall establish the frequency of such tests as it is influenced by such factors as the severity of the operating environment. For R30-37, the MPCV is installed as part of combination block.

Check mark

The minimum pressure check valve (MPCV) should be tested and recalibrated in accordance with any national or local codes that may exist. If no code exists, Ingersoll Rand recommends that the valve is recalibrated at intervals of one year by a licensed contractor or qualified service personnel.

Check mark

Clean Drains with all their components (TIMED DRAINS ONLY)

Check mark

Service Inlet valve service kit

Check mark

Sign off on the compressor maintenance

Run this procedureArrow right

Motor Cowl Cleaning

Check mark

Ensure the compressor is electrically isolated for at least 15 minutes before commencing any maintenance work.

Check mark

Remove the panels from the compressor.

Check mark

Using a clean dry cloth, remove dust from the surface of the motor cowl and ensure all ventilation slots are free of obstructions.

Check mark

Replace the panels.

Check mark

Sign off on the motor cowl cleaning

Run this procedureArrow right

Starter Box Power Drive Module (PDM) Filter Element Replacement

Check mark

Ensure compressor is electrically isolated for at least 15 minutes before commencing any maintenance work

Check mark

Unclip the front grill of the starter box filter housing

Check mark

Remove the filter element from the housing and replace with a new filter element

Check mark

Replace the front grill

Check mark

Sign off on the filter element replacement

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Ingersoll Rand

Explore Other Assets