MaintainX Asset Hub logo
EnterprisePricing
Ingersoll Rand

Ingersoll Rand Air Compressor HP350

Need answers fast?
Explore the manual using AI.

Ingersoll Rand Air Compressor HP350
Ingersoll Rand Air Compressor HP350

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Ingersoll Rand Air Compressor HP350

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Ingersoll Rand Air Compressor HP350

Ingersoll Rand Air Compressor HP350

Create an account to install this asset package.

Maintenance Plans for Ingersoll Rand Air Compressor Model HP350

Integrate maintenance plans directly into your work orders in MaintainX.

Coolant Separator Element Replacement

Check mark

Read Safety Instructions

Check mark

Use correct tools

Check mark

Have recommended spares on hand

Check mark

Separator differential pressure ( Δ P) reaches three times the initial pressure drop or a maximum pressure differential of 12 psi (.8 bar) at full load or if the Intellisys warning CHANGE SEPARATOR ELEMENT is displayed

Check mark

Check condition of separator element, run compressor in full load mode and at rated pressure and observe “Separator Pressure Drop” on the CURRENT STATUS display screen

Check mark

If the display says “xxPSI”, then no maintenance is required. If “ ? ” is flashing on the screen and the display says “CHANGE SEPR ELEMENT”, then the separator element should be replaced

Check mark

Disconnect the scavenge tube at the airend

Check mark

Loosen the fitting that holds the scavenge tube into the tank and withdraw the tube assembly

Check mark

Disconnect the piping from the tank cover. Tag the lines if required

Run this procedureArrow right

Intellisys Removal

Check mark

Safety Instructions

Check mark

Use correct tools

Check mark

Have recommended spares on hand

Check mark

Ensure the compressor is isolated from the compressed air system by closing the isolation valve and venting pressure from the drip leg.

Check mark

Ensure the main power disconnect switch is locked open and tagged

Check mark

Follow these precautions to minimize damage from static electricity.

Check mark

Make the least possible movement to avoid building up static electricity from your clothing or tools.

Check mark

Discharge potential static electricity by touching (grounding) yourself to the starter box.

Check mark

Handle circuit boards only by their edges.

Run this procedureArrow right

1200 Hourly/3 Monthly Hoses Inspection

Check mark

Before starting any maintenance, be certain the following is heeded.

Check mark

Read Safety Instructions

Check mark

Use correct tools

Check mark

Have recommended spares on hand

Check mark

Inspect Hoses

Check mark

Sign off on the hoses inspection

Run this procedureArrow right

8000 Hourly/2 Yearly Premium Coolant Replacement

Check mark

Before starting any maintenance, be certain the following is heeded.

Check mark

Read Safety Instructions

Check mark

Use correct tools

Check mark

Have recommended spares on hand

Check mark

Replace Premium Coolant* (ULTRA)

Check mark

In very clean operating environments and where inlet filter is changed at the above prescribed intervals. In extremely dirty environments change coolant, filters, and separator elements more frequently.

Check mark

Coolant replaced

Check mark

Filters replaced

Check mark

Separator elements replaced

Run this procedureArrow right

1 Monthly Cooling System Water Quality Check

Check mark

Iron content in ppm

Check mark

Sulfate content in ppm

Check mark

Chloride content in ppm

Check mark

Nitrate content in ppm

Check mark

Silica content in ppm

Check mark

Oil and grease content in ppm

Check mark

Ammonia content in ppm

Check mark

Water quality within acceptable limits

Check mark

Sign off on the water quality check

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Ingersoll Rand

Explore Other Assets