MaintainX Asset Hub logo
EnterprisePricing
Genie

Genie Electric Scissors SJIII 3219

Need answers fast?
Explore the manual using AI.

Genie Electric Scissors SJIII 3219
Genie Electric Scissors SJIII 3219

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Genie Electric Scissors SJIII 3219

Genie Electric Scissors SJIII 3219

Create an account to install this asset package.

Maintenance Plans for Genie Electric Scissors Model SJIII 3219

Integrate maintenance plans directly into your work orders in MaintainX.

1 Daily Lifting Mechanism Inspection

Check mark

Raise the platform (refer to Section 3.8-2) until there is adequate clearance to swing down the maintenance support (refer to Section 3.12)

Check mark

Ensure maintenance support is properly secured and shows no visible damage

Check mark

Ensure scissor assembly shows no visible damage and no signs of deformation in weldments

Check mark

Ensure all pins are properly secured

Check mark

Ensure cables and wires are properly routed and shows no signs of wear and/or physical damage

Check mark

Ensure bumpers are secure and shows no sign of visible damage

Check mark

Ensure rollers are secure and there is no visible damage

Check mark

Ensure rollers' path of travel are free from dirt and obstructions

Check mark

Ensure each lift cylinder is properly secured, there are no loose or missing parts and there is no evidence of damage

Run this procedureArrow right

1 Daily Hydraulic Components Inspection

Check mark

WARNING: To avoid injury, do not operate an aerial platform until all malfunctions have been corrected.

Check mark

WARNING: To avoid possible injury, ensure aerial platform power is off during your visual and daily maintenance inspections.

Check mark

CAUTION: Ensure aerial platform is on a firm, level surface.

Check mark

NOTE: While performing visual and daily inspections in different areas, be aware to also inspect limit switches, electrical and hydraulic components.

Check mark

Visual inspection of hoses and fittings

Check mark

Visual inspection of all hydraulic cylinders

Check mark

Visual inspection of all hydraulic manifolds

Check mark

Visual inspection of the underside of the base ground area under the aerial platform

Check mark

Report any malfunctions found during the inspection

Run this procedureArrow right

Lift Winching / Towing

Check mark

Winching and Towing Procedures

Check mark

This section provides the operator with the Winching and Towing procedure, which includes instructions on how to manually release the brakes

Check mark

WARNING

Check mark

Ensure platform is fully lowered before winching or towing

Check mark

Sudden motion could cause the aerial platform to become unstable

Check mark

Death or serious injury could result

Check mark

WARNING

Check mark

In emergency situations where aerial platform functions are not available and lowering is impeded by an obstacle, utmost care must be taken to move aerial platform far enough to clear the obstacle

Check mark

In such cases, operation must be extremely smooth with no sudden movements and must not exceed a speed of 2"/sec (50 mm/sec)

Run this procedureArrow right

1 Daily Entrance Side Inspection

Check mark

WARNING: To avoid injury, do not operate an aerial platform until all malfunctions have been corrected.

Check mark

WARNING: To avoid possible injury, ensure aerial platform power is off during your visual and daily maintenance inspections.

Check mark

CAUTION: Ensure aerial platform is on a firm, level surface.

Check mark

NOTE: While performing visual and daily inspections in different areas, be aware to also inspect limit switches, electrical and hydraulic components.

Check mark

Main Power Disconnect Switch: Turn main power disconnect switch to 'O' off position. Ensure all cables are secure and switch is in proper working condition.

Check mark

Base Control Switches: Ensure there are no signs of visible damage and all switches are in their neutral positions.

Check mark

Free-wheeling Valve Knob (SJIll 3219 - Front Side): Ensure there are no loose or missing parts and there is no visible damage.

Check mark

Brakes: Ensure there are no loose or missing parts and there is no visible damage. Ensure tabs are not locked.

Check mark

110V Outlet Receptacle: Ensure receptacle is free from dirt and obstructions.

Run this procedureArrow right

Battery Maintenance

Check mark

WARNING: Explosion Hazard - Keep flames and sparks away. Do not smoke near batteries.

Check mark

WARNING: Battery acid is extremely corrosive - Wear proper eye and facial protection as well as appropriate protective clothing.

Check mark

Main power disconnect switch in 'O' off position?

Check mark

Battery case free from damage?

Check mark

Battery fluid level in each battery (should be at least 1/2'' or 13mm)

Check mark

Battery terminals and cable ends cleaned thoroughly?

Check mark

All battery connections are tight?

Check mark

Any battery that is damaged or incapable of holding a lasting charge replaced?

Check mark

WARNING: Use original or equivalent to the original parts and components for the aerial platform.

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Genie

Explore Other Assets