MaintainX Asset Hub logo
EnterprisePricing
Ingersoll Rand

Ingersoll Rand Air Compressor XF350

Need answers fast?
Explore the manual using AI.

Ingersoll Rand Air Compressor XF350
Ingersoll Rand Air Compressor XF350

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Ingersoll Rand Air Compressor XF350

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Ingersoll Rand Air Compressor XF350

Ingersoll Rand Air Compressor XF350

Create an account to install this asset package.

Maintenance Plans for Ingersoll Rand Air Compressor Model XF350

Integrate maintenance plans directly into your work orders in MaintainX.

4000 Hourly/6 Monthly Cooler Cores Cleaning

Check mark

Safety Instructions

Check mark

Read Safety Instructions

Check mark

Use correct tools

Check mark

Have recommended spares on hand

Check mark

COOLER CORES: CLEANING

Check mark

Ensure the compressor is isolated from the compressed air system by closing the isolation valve and venting pressure from the drip leg.

Check mark

Ensure the main power disconnect switch is locked open and tagged.

Check mark

TOOLS REQUIRED

Check mark

Select the tools used

Run this procedureArrow right

16000 Hourly/3 Yearly Extended Life Premium Coolant Replacement

Check mark

Before starting any maintenance, be certain the following is heeded.

Check mark

Read Safety Instructions

Check mark

Use correct tools

Check mark

Have recommended spares on hand

Check mark

Extended life Premium coolant* (ULTRA EL)

Check mark

Enter the current operating hours of the machine

Check mark

Is the operating environment very clean?

Check mark

Is the inlet filter changed at the prescribed intervals?

Check mark

Is the operating environment extremely dirty?

Run this procedureArrow right

2000 Hourly/1 Yearly Coolant and Vibration Monitoring

Check mark

Before starting any maintenance, be certain the following is heeded.

Check mark

1) Read Safety Instructions.

Check mark

2) Use correct tools.

Check mark

3) Have recommended spares on hand.

Check mark

FLUID AND VIBRATION MONITORING

Check mark

Ingersoll Rand recommends incorporating predictive maintenance, specifically the use of coolant and vibration analysis, into all Preventative Maintenance programs.

Check mark

Predictive Maintenance is designed to increase system reliability and prevent costly downtime.

Check mark

Through the use of sophisticated diagnostic tools, including fluid, vibration, and optional air analysis, IRA Certified Service Technicians can identify and correct potential problems BEFORE they can cause expensive unscheduled downtime.

Check mark

How does predictive analysis work? By establishing an initial baseline for normal operation, and then regularly monitoring fluid and vibration conditions, any sudden deviation or significant increase from this baseline can be identified and investigated to pinpoint the cause.

Run this procedureArrow right

4000 Hourly/1 Yearly Separator Tank Scavenger Screen/Orifice Cleaning

Check mark

Before starting any maintenance, be certain the following is heeded.

Check mark

Read Safety Instructions

Check mark

Use correct tools

Check mark

Have recommended spares on hand

Check mark

TOOLS REQUIRED

Check mark

Select the tools used

Check mark

PROCEDURE

Check mark

The screen/orifice assemblies are similar in appearance to a straight tubing connector and will be located between two pieces of 1/4 inch O.D. scavenge line tubing.

Check mark

The main body is made from 1/2 inch hexagon shaped steel and the diameter of the orifice and a direction-offlow arrow is stamped in flat areas of the hexagon.

Run this procedureArrow right

2000 Hourly Coolant Filter Replacement

Check mark

Safety Instructions: Read before starting any maintenance

Check mark

Use correct tools and have recommended spares on hand

Check mark

Suitable device used to loosen the old element

Check mark

Drain pan used to catch any leakage during removal

Check mark

Old element discarded

Check mark

Sealing surface of the filter wiped with a clean, lint-free rag

Check mark

Replacement element removed from its protective package

Check mark

Small amount of clean lubricant applied on the rubber seal of the replacement element

Check mark

Replacement element installed

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Ingersoll Rand

Explore Other Assets