MaintainX Logo
EnterprisePricing
Genie

Genie Compact Personnel Lift PLC-36

Need answers fast?
Explore the manual using AI.

Genie Compact Personnel Lift PLC-36
Genie Compact Personnel Lift PLC-36

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Genie Compact Personnel Lift PLC-36

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Genie Compact Personnel Lift PLC-36

Genie Compact Personnel Lift PLC-36

Create an account to install this asset package.

Maintenance Plans for Genie Compact Personnel Lift Model PLC-36

Integrate maintenance plans directly into your work orders in MaintainX.

1 Monthly Lift Maintenance

Check mark

DO NOT perform service and maintenance requiring access to components in the base assembly unless platform is securely blocked.; ALWAYS disconnect electrical input when servicing electrical components to prevent electric shock or machine operation.

Check mark

NEVER leave battery charger receptacle connected while servicing the unit.

Check mark

Outrigger (Base): - Check screw jack pads for wear. Check outriggers and screw jacks for structural damage.

Check mark

Base Weldment (Base): - Check for structurel damage or cracked welds. Check all fasteners for tightness.

Check mark

Lift Chain Adjusting Nuts (Mast Assembly): - Check adjusting and jam nuts for tightness.

Check mark

Hydraulic Oil Reservoir (Mast Assembly): - Check oil level

Check mark

Hydraulic Hoses and Tubes (Mast & Base): - Check hoses and tubes for leaks, binding, or cuts. Check cylinder fittings.

Check mark

Cage Assembly (Mast): - Check cage for structural damage. Ensure gate entry mechanism operates correctly.

Check mark

Mast: - Check for structural damage. Check all fasteners for tightness.;

Run this procedureArrow right

1 Yearly Lift Maintenance

Check mark

!DO NOT perform service and maintenance requiring access to components in the base assembly unless platform is securely blocked.; !ALWAYS disconnect electrical input when servicing electrical components to prevent electric shock or machine operation.

Check mark

!NEVER leave battery charger receptacle connected while servicing the unit.

Check mark

Hydraulic Oil (Base): - Change hydraulic oil

Check mark

Wheels and Casters: - Check wheels and casters for wear and proper operation.

Check mark

- Check all painted surfaces for corrosion.;

Run this procedureArrow right

1 Daily Lift Maintenance

Check mark

DO NOT perform service and maintenance requiring access to components in the base assembly unless platform is securely blocked.; ALWAYS disconnect electrical input when servicing electrical components to prevent electric shock or machine operation.

Check mark

NEVER leave battery charger receptacle connected while servicing the unit.

Check mark

Battery (Base): - Check electrolyte level and specific gravity. If lower than 1.170, charge batteries. (Do not fill batteries before charging.)

Check mark

Lift Chains (Mast Assembly): - Check chains for damage or wear. Maintain proper adjustment. Ensure tracks are free of debris and obstructions.

Check mark

Sequencing Cables (Mast Assembly): - Check cables for damage or wear. Maintain proper adjustment.;

Run this procedureArrow right

3 Monthly Lift Maintenance

Check mark

DO NOT perform service and maintenance requiring access to components in the base assembly unless platform is securely blocked.; ALWAYS disconnect electrical input when servicing electrical components to prevent electric shock or machine operation.

Check mark

NEVER leave battery charger receptacle connected while servicing the unit.

Check mark

Lift Chains (Mast): - Lubricate lift Chains and sheaves. Adjust chain tension. Lift Chain Tension Adjustment: Maintain even tension on lift chains. Do not allow any chain to go slack. Due to slight stretch after a period of use under load, the chain tension may need adjustment.; Correct chain adjustment is required to ensure that the two chains in each column share the load equally and that all columns start off and come to rest on the base simultaneously.

Check mark

PREPARATION: 1. Make certain unit is fully lowered and cylinder depressurized.

Check mark

2. Any load is removed from platform.

Check mark

3. Battery pack removed or AC input disconnected.

Check mark

4. Assistance is available to lay unit to horizontal position.

Check mark

PROCEDURE: 1. Secure column sections with hold down bar and lay unit back on horizontal transport wheels.

Check mark

2. Release hold down bar and slide column sections apart enough to allow access to chain termination studs.

Run this procedureArrow right

Parts for Genie Compact Personnel Lift PLC-36

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

DC Power Unit (Fenner-Stone "Workforce")

15778

AC Power Unit (John S. Barnes )

12250

AC & DC Power Unit (Fenner-Stone )

6681

DC Power Unit (Fenner-Stone "Workforce")

15777

AC Power Unit (John S. Barnes )

12727

DC Power Unit (Fenner-Stone "Workforce")

15778

AC Power Unit (John S. Barnes )

12250

AC & DC Power Unit (Fenner-Stone )

6681

DC Power Unit (Fenner-Stone "Workforce")

15777

AC Power Unit (John S. Barnes )

12727

DC Power Unit (Fenner-Stone "Workforce")

15778

AC Power Unit (John S. Barnes )

12250

AC & DC Power Unit (Fenner-Stone )

6681

DC Power Unit (Fenner-Stone "Workforce")

15777

AC Power Unit (John S. Barnes )

12727

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Genie

Explore Other Assets