MaintainX Logo
EnterprisePricing
Genie

Genie Articulated Boom Lift ZX-135/70

Need answers fast?
Explore the manual using AI.

Genie Articulated Boom Lift ZX-135/70
Genie Articulated Boom Lift ZX-135/70

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Genie Articulated Boom Lift ZX-135/70

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Genie Articulated Boom Lift ZX-135/70

Genie Articulated Boom Lift ZX-135/70

Create an account to install this asset package.

Maintenance Plans for Genie Articulated Boom Lift Model ZX-135/70

Integrate maintenance plans directly into your work orders in MaintainX.

3 Monthly Drive Speed ALC1000 Test

Check mark

- Test the Drive Speed - Raised or Extended Position, ALC1000 Models

Check mark

Proper drive function is essential to safe machine operation. The drive function should respond quickly and smoothly to operator control

Check mark

Drive performance should also be free of hesitation, jerking and unusual noise over the entire proportionally controlled speed range

Check mark

Note: Perform this procedure with the machine on a firm, level surface that is free of obstructions

Check mark

This maintenance procedure applies to the following models: S-100, S-105, S-120, S-125, SX-105 XC, SX-125 XC, SX-135 XC, S-100HD, S-120HD, SX-150, SX-180, 2-80/60, Z-135/70 and ZX-135/70

Check mark

S-100, S-105, S-120, S-125, SX-105 XC, SX-125 XC, SX-135 XC, S-100HD and S-120HD

Check mark

1. Create start and finish lines by marking two lines on the ground 40 feet / 12.2 m apart

Check mark

2. Raise the boom to a horizontal position

Check mark

3. Extend the primary boom until the envelope alarm and LED are activated

Run this procedureArrow right

3 Monthly Safety Envelope And Circuit Test

Check mark

- Test the Safety Envelope and Circuits - Z-80/60

Check mark

Testing the machine safety envelope is critical to safe machine operation. If the boom is allowed to operate when a safety switch is not functioning correctly, the machine stability is compromised and may tip over

Check mark

For limit switch and angle sensor information, Refer to appropriate Service and Repair Manual for your machine

Check mark

Note: Use the following chart to identify the description of each LCD screen control button used in this procedure

Check mark

Secondary Boom #1 Angle Safety Limit Switch, LSS2AS

Check mark

1. Turn the key switch to ground control and pull out the red Emergency Stop button to the on position at both ground and platform controls

Check mark

2. Start the engine from the ground controls

Check mark

3. Press the (plus)(minus) buttons on the LCD screen to activate status mode

Check mark

4. Press the enter or previous button on the LCD screen until secondary boom length is displayed

Run this procedureArrow right

3 Monthly Secondary Boom Angle Sensor Test

Check mark

Warning: A properly functioning secondary boom angle sensor is essential to safe machine operation.

Check mark

Note: The turntable level sensor must be tested before starting this procedure.

Check mark

Note: A digital level will be required to perform this procedure.

Check mark

Note: A kit is available through Genie Product Support (Genie part number 58351). This kit includes a digital level with a magnetic base and cable harnesses.

Check mark

Note: A properly calibrated digital level is essential to proper machine calibration.

Check mark

Note: Use the following chart to identify the description of each LCD screen control button used in this procedure.

Check mark

Turn the key switch to ground control and pull out the red Emergency Stop button to the on position at both ground and platform controls.

Check mark

Start the engine from the ground controls.

Check mark

Press the plus and minus buttons at the same time on the LCD screen to enter the MACHINE STATUS screen. Press the enter or previous button until SECONDARY BOOM ANGLE is displayed.

Run this procedureArrow right

3 Monthly Exhaust System Check

Check mark

WARNING! Bodily injury hazard. Do not inspect while the engine is running. Remove the key to secure from operation

Check mark

CAUTION! Burn hazard. Beware of hot engine components. Contact with hot engine components may result in severe burns

Check mark

All nuts and bolts are tight

Check mark

All welds are free of cracks

Check mark

No exhaust leaks detected

Check mark

Sign off on the exhaust system check

Run this procedureArrow right

250 Hourly Deutz Engine Maintanance

Check mark

Deutz Engine Maintenance Procedure:

Check mark

Sign off on the Deutz Engine Maintenance

Run this procedureArrow right

Parts for Genie Articulated Boom Lift ZX-135/70

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Digital Level Kit

58351

Digital Protractor

58377

O-ring Field Service Kit

49612

Digital Level Kit

58351

Digital Protractor

58377

O-ring Field Service Kit

49612

Digital Level Kit

58351

Digital Protractor

58377

O-ring Field Service Kit

49612

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Genie

Explore Other Assets