The Genie Articulated Boom Lift Z62 is a versatile and reliable aerial work platform designed for various industrial applications. Known for its exceptional reach and maneuverability, this model ensures safety and efficiency on job sites, making it an essential asset for construction and maintenance tasks.
Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Genie Articulated Boom Lift Z62
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
3 Monthly Alarm Package Test
Test the Alarm Package (if equipped). Note: The alarms and beacon will operate with the engine running or not running.
Turn the key switch to ground control and pull out the red Emergency Stop button to the on position at both ground and platform controls. Did the alarm sound twice and the flashing beacon turn on and flash?
Activate the boom down function, hold for a moment and then release it. Did the descent alarm sound when the down function is activated?
Turn the key switch to platform controls. Is the flashing beacon on and flashing?
Press down the foot switch. Activate the boom down function, hold for a moment and then release it. Did the descent alarm sound when the down function is activated?
Press down the foot switch. Move the drive control handle off center, hold for a moment and then release it. Move the drive control handle off center in the opposite direction, hold for a moment and then release it. Did the travel alarm sound when the drive control handle is moved off center in either direction?
Sign off on the alarm package test
1 Yearly Dual Capacity And Platform Overload System Z-45 XC Test
Warning: This procedure requires trained personnel with PPE!
Perform this procedure with the boom fully retracted and in the stowed position and with the machine on a firm, level surface
All weight, tools, accessories and equipment removed from the platform
Key switch turned to ground control and red Emergency Stop button pulled out to the on position at both ground and platform controls
Test weight of 600 lbs / 272kg placed in the center of the platform and secured
Unrestricted range of motion indicator light is on at the ground controls
Restricted range of motion light is on at the ground controls
Primary boom fully extended and retracted
Additional 100 lbs / 45kg added to the platform
3 Monthly Oscillate Directional Valve Linkage Inspection
- Check the Oscillate Directional Valve Linkage (if equipped)
1. Remove the drive chassis cover and the axle covers from the non-steer end of the drive chassis
2. Locate the oscillate directional valve inside of the non-steer axle and inspect the linkage for the following:
1) Lock nut is tight against yoke
2) Yoke clevis pins are installed
3) Cotter pins are installed through clevis pins
4) Linkage is properly attached to directional valve;
2000 Hourly Turntable Rotation Gear Backlash Check
Warning: This procedure does not apply to the Z-60/80 models
Note: Perform this procedure with the machine fully stowed and the counterweight at the square end of the machine
Note: Perform this procedure with the machine on a firm, level surface that is free of obstructions
Rotate the turntable until the boom is centered between the circle end wheels
Apply approximately 20 lbs / 89 N of side force to the platform, moving the platform to one side as far as it will go
Using a feeler gauge, measure the gap between the swing hub pinion gear and the turntable rotation bearing at the center tooth on one of the drive hubs
Select the model of the machine
Check if the gap is within tolerance for the selected model
If the gap is not within tolerance, the backlash needs to be adjusted. Refer to Repair Procedure in the appropriate Service and Repair Manual for your machine, How to Adjust the Turntable Rotation Gear Backlash
1 Yearly Boom Extend/Retract Cables Inspection
- Inspect the Boom Extend/Retract Cables
Manufacturers specifications require that this procedure be performed by personnel that are competent in cable / wire rope inspection
Note: Additional or more frequent inspections may be required due to the following:
• exposed to hostile or corrosive environmental conditions
• boom is overloaded
• sustains a shock load
• electrical arcing
• unused for extended periods
The boom extend/retract cables are responsible for the extension and retraction of the boom tubes
Access the parts list for your equipment in MaintainX.
O-ring Field Service Kit
49612
Digital Protractor
58377
Digital Level Kit
58351
O-ring Field Service Kit
49612
Digital Protractor
58377
Digital Level Kit
58351
O-ring Field Service Kit
49612
Digital Protractor
58377
Digital Level Kit
58351
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX