MaintainX Logo
EnterprisePricing
Genie

Genie Articulated Boom Lift Z62

Need answers fast?
Explore the manual using AI.

Genie Articulated Boom Lift Z62
Genie Articulated Boom Lift Z62

The Genie Articulated Boom Lift Z62 is a versatile and reliable aerial work platform designed for various industrial applications. Known for its exceptional reach and maneuverability, this model ensures safety and efficiency on job sites, making it an essential asset for construction and maintenance tasks.

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Genie Articulated Boom Lift Z62

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Genie Articulated Boom Lift Z62

Genie Articulated Boom Lift Z62

Create an account to install this asset package.

Maintenance Plans for Genie Articulated Boom Lift Model Z62

Integrate maintenance plans directly into your work orders in MaintainX.

3 Monthly Alarm Package Test

Check mark

Test the Alarm Package (if equipped). Note: The alarms and beacon will operate with the engine running or not running.

Check mark

Turn the key switch to ground control and pull out the red Emergency Stop button to the on position at both ground and platform controls. Did the alarm sound twice and the flashing beacon turn on and flash?

Check mark

Activate the boom down function, hold for a moment and then release it. Did the descent alarm sound when the down function is activated?

Check mark

Turn the key switch to platform controls. Is the flashing beacon on and flashing?

Check mark

Press down the foot switch. Activate the boom down function, hold for a moment and then release it. Did the descent alarm sound when the down function is activated?

Check mark

Press down the foot switch. Move the drive control handle off center, hold for a moment and then release it. Move the drive control handle off center in the opposite direction, hold for a moment and then release it. Did the travel alarm sound when the drive control handle is moved off center in either direction?

Check mark

Sign off on the alarm package test

Run this procedureArrow right

1 Yearly Dual Capacity And Platform Overload System Z-45 XC Test

Check mark

Warning: This procedure requires trained personnel with PPE!

Check mark

Perform this procedure with the boom fully retracted and in the stowed position and with the machine on a firm, level surface

Check mark

All weight, tools, accessories and equipment removed from the platform

Check mark

Key switch turned to ground control and red Emergency Stop button pulled out to the on position at both ground and platform controls

Check mark

Test weight of 600 lbs / 272kg placed in the center of the platform and secured

Check mark

Unrestricted range of motion indicator light is on at the ground controls

Check mark

Restricted range of motion light is on at the ground controls

Check mark

Primary boom fully extended and retracted

Check mark

Additional 100 lbs / 45kg added to the platform

Run this procedureArrow right

3 Monthly Oscillate Directional Valve Linkage Inspection

Check mark

- Check the Oscillate Directional Valve Linkage (if equipped)

Check mark

1. Remove the drive chassis cover and the axle covers from the non-steer end of the drive chassis

Check mark

2. Locate the oscillate directional valve inside of the non-steer axle and inspect the linkage for the following:

Check mark

1) Lock nut is tight against yoke

Check mark

2) Yoke clevis pins are installed

Check mark

3) Cotter pins are installed through clevis pins

Check mark

4) Linkage is properly attached to directional valve;

Run this procedureArrow right

2000 Hourly Turntable Rotation Gear Backlash Check

Check mark

Warning: This procedure does not apply to the Z-60/80 models

Check mark

Note: Perform this procedure with the machine fully stowed and the counterweight at the square end of the machine

Check mark

Note: Perform this procedure with the machine on a firm, level surface that is free of obstructions

Check mark

Rotate the turntable until the boom is centered between the circle end wheels

Check mark

Apply approximately 20 lbs / 89 N of side force to the platform, moving the platform to one side as far as it will go

Check mark

Using a feeler gauge, measure the gap between the swing hub pinion gear and the turntable rotation bearing at the center tooth on one of the drive hubs

Check mark

Select the model of the machine

Check mark

Check if the gap is within tolerance for the selected model

Check mark

If the gap is not within tolerance, the backlash needs to be adjusted. Refer to Repair Procedure in the appropriate Service and Repair Manual for your machine, How to Adjust the Turntable Rotation Gear Backlash

Run this procedureArrow right

1 Yearly Boom Extend/Retract Cables Inspection

Check mark

- Inspect the Boom Extend/Retract Cables

Check mark

Manufacturers specifications require that this procedure be performed by personnel that are competent in cable / wire rope inspection

Check mark

Note: Additional or more frequent inspections may be required due to the following:

Check mark

• exposed to hostile or corrosive environmental conditions

Check mark

• boom is overloaded

Check mark

• sustains a shock load

Check mark

• electrical arcing

Check mark

• unused for extended periods

Check mark

The boom extend/retract cables are responsible for the extension and retraction of the boom tubes

Run this procedureArrow right

Parts for Genie Articulated Boom Lift Z62

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

O-ring Field Service Kit

49612

Digital Protractor

58377

Digital Level Kit

58351

O-ring Field Service Kit

49612

Digital Protractor

58377

Digital Level Kit

58351

O-ring Field Service Kit

49612

Digital Protractor

58377

Digital Level Kit

58351

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Genie

Explore Other Assets