MaintainX Logo
EnterprisePricing
Genie

Genie Articulated Boom Lift Z60

Need answers fast?
Explore the manual using AI.

Genie Articulated Boom Lift Z60
Genie Articulated Boom Lift Z60

The Genie Articulated Boom Lift Z60 is a versatile aerial work platform designed for enhanced reach and maneuverability in various industrial applications. Known for its reliability and safety features, this boom lift is ideal for construction, maintenance, and warehousing tasks, ensuring efficient operation at height.

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Genie Articulated Boom Lift Z60

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Genie Articulated Boom Lift Z60

Genie Articulated Boom Lift Z60

Create an account to install this asset package.

Maintenance Plans for Genie Articulated Boom Lift Model Z60

Integrate maintenance plans directly into your work orders in MaintainX.

3 Monthly Alarm Package Test

Check mark

- Test the Alarm Package (if equipped)

Check mark

Note: The alarms and beacon will operate with the engine running or not running

Check mark

1. Turn the key switch to ground control and pull out the red Emergency Stop button to the on position at both ground and platform controls

Check mark

Z-80/60, S-80 XC, S-85 XC, S-100, S-105, S-120, S-125, S-100HD, S-120HD, SX-105 XC, SX-125 XC, SX-135 XC, SX-150, SX-180, Z-135/70 and ZX-135/70 Models:

Check mark

Result: The alarm should sound twice. The flashing beacon should be on and flashing

Check mark

All other models:

Check mark

Result: The flashing beacon should be on and flashing

Check mark

All Models:

Check mark

2. Activate the boom down function, hold for a moment and then release it

Run this procedureArrow right

3 Monthly Boom Angle Sensor Test

Check mark

- Test the Primary Boom Angle Sensor - SX-105 XC, SX-125 XC, SX-135 XC, SX-150 and SX-180

Check mark

A properly functioning primary boom angle sensor is essential to safe machine operation. The ECM at the ground controls (TCON) monitors the position and angle of the primary boom using the signal from the primary boom angle sensor

Check mark

The primary boom angle sensor signal is used to control the ramping of the primary boom, limiting the speed of the primary boom to 2.3 feet / 0.7 meters per second

Check mark

Note: The turntable level sensor must be tested before starting this procedure. Refer to Maintenance Procedures, Test the Turntable Level Sensor

Check mark

Note: A digital level will be required to perform this procedure

Check mark

Note: A kit is available through Genie Product Support (Genie part number 58351). This kit includes a digital level with a magnetic base and cable harnesses

Check mark

Note: A properly calibrated digital level is essential to proper machine calibration. Refer to the manufactures calibration information

Check mark

Note: Use the following chart to identify the description of each LCD screen control button used in this procedure

Check mark

Note: Perform this procedure with the booms in the fully stowed position and the axles fully extended

Run this procedureArrow right

2000 Hourly Free-Wheel Configuration Check

Check mark

- Check the Free-wheel Configuration

Check mark

Proper use of the free-wheel configuration is essential to safe machine operation. The free-wheel configuration is used primarily for towing. A machine configured to free-wheel without operator knowledge may cause death or serious injury and property damage

Check mark

Models with 2 wheel steer will be referenced with Non-steer and steer wheels

Check mark

Models with 4 wheel steer will be referenced with Circle-end and Square-end wheels

Check mark

WARNING!

Check mark

Collision hazard. Select a work site that is firm and level

Check mark

NOTICE:

Check mark

Component damage hazard. If the machine must be towed, do not exceed 2 mph / 3.2 km/h

Check mark

Non-steer or Circle-end wheels:

Run this procedureArrow right

1 Yearly Boom Extend/Retract Cables Inspection

Check mark

- Inspect the Boom Extend/Retract Cables

Check mark

Manufacturers specifications require that this procedure be performed by personnel that are competent in cable / wire rope inspection

Check mark

Note: Additional or more frequent inspections may be required due to the following:

Check mark

• exposed to hostile or corrosive environmental conditions

Check mark

• boom is overloaded

Check mark

• sustains a shock load

Check mark

• electrical arcing

Check mark

• unused for extended periods

Check mark

The boom extend/retract cables are responsible for the extension and retraction of the boom tubes

Run this procedureArrow right

100 Hourly GM .998L Engine Maintanance

Check mark

- Check Coolant level

Check mark

- Check Oil level

Check mark

- Check for leaks Oil, fuel and coolant systems

Check mark

- Replace engine oil and filter

Check mark

- Drain/clean LPG vaporizer

Check mark

- Check PCV valve

Check mark

- Clean/replace air cleaner element

Check mark

- Check timing belt

Check mark

- Check electrical wiring for chafing or damage

Run this procedureArrow right

Parts for Genie Articulated Boom Lift Z60

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Digital Protractor

58377

O-ring Field Service Kit

49612

Digital Level Kit

58351

Digital Protractor

58377

O-ring Field Service Kit

49612

Digital Level Kit

58351

Digital Protractor

58377

O-ring Field Service Kit

49612

Digital Level Kit

58351

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Genie

Explore Other Assets