MaintainX Logo
EnterprisePricing
Genie

Genie Articulated Boom Lift Z45/25JBE

Need answers fast?
Explore the manual using AI.

Genie Articulated Boom Lift Z45/25JBE
Genie Articulated Boom Lift Z45/25JBE

The Genie Articulated Boom Lift Z45/25JBE is a versatile aerial work platform designed for optimal reach and maneuverability. Ideal for construction and maintenance tasks, this reliable equipment ensures safety and efficiency in various applications, making it a preferred choice among professionals.

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Genie Articulated Boom Lift Z45/25JBE

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Genie Articulated Boom Lift Z45/25JBE

Genie Articulated Boom Lift Z45/25JBE

Create an account to install this asset package.

Maintenance Plans for Genie Articulated Boom Lift Model Z45/25JBE

Integrate maintenance plans directly into your work orders in MaintainX.

1 Yearly Platform Load Sense System Test

Check mark

- Test the Platform Load Sense System - S-60 HC

Check mark

Genie specifications require that this procedure be performed annually OR when the machine fails to lift the maximum rated load

Check mark

Testing the platform overload system regularly is essential to safe machine operation. Continued use of an improperly operating platform overload system could result in the system not sensing an overloaded platform condition. Machine stability could be compromised resulting in the machine tipping over

Check mark

Note: Be sure that no load sense system faults exist prior to performing this procedure

Check mark

Note: On a properly functioning machine, the LEDs on both control modules, located next to the ground control box, should be off

Check mark

1. Remove all weight, tools, accessories and equipment from the platform

Check mark

Note: Failure to remove all weight, tools and accessories from the platform will result in an inaccurate test

Check mark

2. Turn the key switch to ground control and pull out the red Emergency Stop button to the on position at both ground and platform controls

Check mark

3. Start the engine from the ground controls

Run this procedureArrow right

3 Monthly Primary Boom Angle Sensor Test

Check mark

Warning: This procedure requires trained personnel with PPE!

Check mark

Ensure the turntable level sensor and secondary boom angle sensor have been tested before starting this procedure.

Check mark

A digital level will be required to perform this procedure.

Check mark

Perform this procedure with the machine on a firm, level surface with the booms in the fully stowed position and the axles fully extended.

Check mark

Turn the key switch to ground control and pull out the red Emergency Stop button to the on position at both ground and platform controls.

Check mark

Start the engine from the ground controls.

Check mark

Press the enter or previous button on the LCD screen until PRIMARY BOOM ANGLE TO GRAVITY DEGREES is displayed.

Check mark

Place a digital level that has been calibrated to gravity on top of the primary boom.

Check mark

Raise the primary boom while watching the display screen.

Run this procedureArrow right

3 Monthly Ground Control Override Test

Check mark

- Test the Ground Control Override

Check mark

A properly functioning ground control override is essential to safe machine operation. The ground control override function is intended to allow ground personnel to operate the machine from the ground controls whether or not the Emergency Stop button on the platform controls is in the on or off position

Check mark

This function is particularly useful if the operator at the platform controls cannot return the boom to the stowed position

Check mark

1. Push in the platform red Emergency Stop button to the off position

Check mark

2. Turn the key switch to ground controls

Check mark

3. Pull out the red Emergency Stop button to the on position at the ground controls

Check mark

4. From the ground controls, operate each boom function through a partial cycle

Check mark

• Result: All boom functions should operate

Check mark

5. From the platform, activate the foot switch and operate each boom function

Run this procedureArrow right

1 Yearly Turntable Bearing Inspection

Check mark

Warning: This procedure requires trained personnel with PPE!

Check mark

Perform this procedure with the machine on a firm, level surface with the boom in the stowed position

Check mark

Grease the turntable bearing

Check mark

Torque the turntable bearing bolts to specification

Check mark

Raise the boom to full height using the ground controls

Check mark

Place a dial indicator between the drive chassis and the turntable

Check mark

Adjust the dial indicator needle to the 'zero' position

Check mark

Lower the boom to a horizontal position and fully extend the boom

Check mark

Enter the reading on the dial indicator

Run this procedureArrow right

3 Monthly Aircraft Protection System Test

Check mark

Start this procedure with the machine in the fully stowed position

Check mark

Turn the key switch to platform control and pull out the red Emergency Stop button to the on position at both the ground and platform controls

Check mark

Start the engine from the platform controls

Check mark

Move the yellow bumper at the bottom of the platform 4 inches/10 cm in any direction

Check mark

Activate each function control handle or toggle switch

Check mark

Extend the primary boom approximately 3 ft / 1 m

Check mark

Move the yellow bumper at the bottom of the platform 4 inches/10 cm in any direction

Check mark

Activate each function control handle or toggle switch

Check mark

Activate and hold the aircraft protection override switch

Run this procedureArrow right

Parts for Genie Articulated Boom Lift Z45/25JBE

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Digital Level Kit

58351

Digital Protractor

58377

O-ring Field Service Kit

49612

Digital Level Kit

58351

Digital Protractor

58377

O-ring Field Service Kit

49612

Digital Level Kit

58351

Digital Protractor

58377

O-ring Field Service Kit

49612

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Genie

Explore Other Assets