MaintainX Logo
EnterprisePricing
Genie

Genie Articulated Boom Lift Z-62/40

Need answers fast?
Explore the manual using AI.

Genie Articulated Boom Lift Z-62/40
Genie Articulated Boom Lift Z-62/40

The Genie Articulated Boom Lift Z-62/40 is a versatile aerial work platform designed for enhanced reach and maneuverability in various industrial applications. Known for its reliability and efficiency, this boom lift is ideal for construction, maintenance, and repair tasks, ensuring safety and productivity on the job site.

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Genie Articulated Boom Lift Z-62/40

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Genie Articulated Boom Lift Z-62/40

Genie Articulated Boom Lift Z-62/40

Create an account to install this asset package.

Maintenance Plans for Genie Articulated Boom Lift Model Z-62/40

Integrate maintenance plans directly into your work orders in MaintainX.

100 Hourly GM .998L Engine Maintanance

Check mark

- Check Coolant level

Check mark

- Check Oil level

Check mark

- Check for leaks Oil, fuel and coolant systems

Check mark

- Replace engine oil and filter

Check mark

- Drain/clean LPG vaporizer

Check mark

- Check PCV valve

Check mark

- Clean/replace air cleaner element

Check mark

- Check timing belt

Check mark

- Check electrical wiring for chafing or damage

Run this procedureArrow right

3000 Hourly Engine Maintenance

Check mark

- Perform Engine Maintenance

Check mark

Required maintenance procedures and additional engine information are available in the manufacturer's manuals. Refer to Specifications, Engine Operator and Maintenance Manuals

Check mark

Deutz Models:

Check mark

All Models:

Check mark

• Injection valve- replace

Check mark

• Toothed belt - replace

Check mark

• V-belt and tensioning pulley - replace

Check mark

D 2.9 and TD 2.9 Models:

Check mark

• Aftercooler core - clean/test

Run this procedureArrow right

3 Monthly Alarm Package Test

Check mark

- Test the Alarm Package (if equipped)

Check mark

Note: The alarms and beacon will operate with the engine running or not running

Check mark

1. Turn the key switch to ground control and pull out the red Emergency Stop button to the on position at both ground and platform controls

Check mark

Z-80/60, S-80 XC, S-85 XC, S-100, S-105, S-120, S-125, S-100HD, S-120HD, SX-105 XC, SX-125 XC, SX-135 XC, SX-150, SX-180, Z-135/70 and ZX-135/70 Models:

Check mark

Result: The alarm should sound twice. The flashing beacon should be on and flashing

Check mark

All other models:

Check mark

Result: The flashing beacon should be on and flashing

Check mark

All Models:

Check mark

2. Activate the boom down function, hold for a moment and then release it

Run this procedureArrow right

1 Yearly Extendable Axle Inspection

Check mark

- Check the Extendable Axle - S-100, S-100HD, S-105, S-120, S-120HD and S-125

Check mark

Maintaining the axle wear pads in good condition is essential to safe machine operation. Wear pads are placed on axle tube surfaces to provide a low friction, replaceable wear pad between moving parts. Improperly shimmed wear pads or continued use of worn out wear pads may result in component damage and unsafe operating conditions

Check mark

1. Start the engine from the platform controls and extend the axles

Check mark

2. Measure each axle wear pad

Check mark

3. Replace any wear pad if it is less than specification. If a wear pad is not less than specification, shim as necessary to obtain minimum clearance and no drag

Check mark

4. Extend and retract the axles through the entire range of motion to check for tight spots that may cause binding or scraping of the axle tubes

Check mark

Note: Always maintain squareness between the outer and inner axle tubes

Check mark

Extendable axle wear pad Wear pad specifications : Minimum 0.4375 inch / 11.11 mm;

Run this procedureArrow right

1 Yearly Platform Load Sense System Test

Check mark

- Test the Platform Load Sense System - S-60 HC

Check mark

Genie specifications require that this procedure be performed annually OR when the machine fails to lift the maximum rated load

Check mark

Testing the platform overload system regularly is essential to safe machine operation. Continued use of an improperly operating platform overload system could result in the system not sensing an overloaded platform condition. Machine stability could be compromised resulting in the machine tipping over

Check mark

Note: Be sure that no load sense system faults exist prior to performing this procedure

Check mark

Note: On a properly functioning machine, the LEDs on both control modules, located next to the ground control box, should be off

Check mark

1. Remove all weight, tools, accessories and equipment from the platform

Check mark

Note: Failure to remove all weight, tools and accessories from the platform will result in an inaccurate test

Check mark

2. Turn the key switch to ground control and pull out the red Emergency Stop button to the on position at both ground and platform controls

Check mark

3. Start the engine from the ground controls

Run this procedureArrow right

Parts for Genie Articulated Boom Lift Z-62/40

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Digital Level Kit

58351

O-ring Field Service Kit

49612

Digital Protractor

58377

Digital Level Kit

58351

O-ring Field Service Kit

49612

Digital Protractor

58377

Digital Level Kit

58351

O-ring Field Service Kit

49612

Digital Protractor

58377

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Genie

Explore Other Assets