MaintainX Logo
EnterprisePricing
Genie

Genie Articulated Boom Lift Z-45 XC

Need answers fast?
Explore the manual using AI.

Genie Articulated Boom Lift Z-45 XC
Genie Articulated Boom Lift Z-45 XC

The Genie Articulated Boom Lift Z-45 XC is a versatile aerial work platform designed for enhanced reach and maneuverability. This reliable equipment from Genie is ideal for construction and maintenance tasks, offering exceptional performance and safety features for operators in various industrial applications.

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Genie Articulated Boom Lift Z-45 XC

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Genie Articulated Boom Lift Z-45 XC

Genie Articulated Boom Lift Z-45 XC

Create an account to install this asset package.

Maintenance Plans for Genie Articulated Boom Lift Model Z-45 XC

Integrate maintenance plans directly into your work orders in MaintainX.

1 Yearly Dual Capacity And Platform Overload System S-models Test

Check mark

- Test the Dual Capacity and Platform Overload System - SX-105 XC, SX-125 XC and SX-135 XC Models Genie specifications require that this procedure be performed annually OR when the machine fails to lift the maximum rated load

Check mark

Testing the platform overload system regularly is essential to safe machine operation. Continued use of an improperly operating platform overload system could result in the system not sensing an overloaded platform condition. Machine stability could be compromised resulting in the machine tipping over

Check mark

Note: Perform this procedure with the boom fully retracted and in the stowed position and with the machine on a firm, level surface

Check mark

1. Remove all weight, tools, accessories and equipment from the platform

Check mark

Note: Failure to remove all weight, tools and accessories from the platform will result in an inaccurate test

Check mark

2. Turn the key switch to ground control and pull out the red Emergency Stop button to the on position at both ground and platform controls

Check mark

3. Using a suitable lifting device, place a test weight of 600 lbs / 272kg in the center of the platform. Secure the weight to the platform

Check mark

Note: The test weight may be within -0% / +5%

Check mark

Result: The unrestricted range of motion indicator light is on at ground controls

Run this procedureArrow right

1 Daily Kubota Engine Maintanance

Check mark

- Check Fuel hoses and clamp bands

Check mark

- Replace Engine oil , Z482

Check mark

- Check Fan belt tension and damage

Check mark

- Check Battery electrolyte level

Check mark

- Check Spark plug

Check mark

- Clean Air cleaner element (Replace the element after 6 times cleaning)

Check mark

- Clean Fuel filter (element type)

Check mark

- Replace Oil filter cartridge, Z482

Check mark

- Replace Oil filter cartridge, D1105, WG972

Run this procedureArrow right

3 Monthly Turntable Level Sensor Test

Check mark

- Test the Turntable Level Sensor - Z-135/70, ZX-135/70, SX-105 XC, SX-125 XC, SX-135 XC, SX-150 and SX-180

Check mark

A properly functioning level sensor (SCON) is essential to safe machine operation. The ECM at the ground controls (CON) monitors the position and angle of the machine using the signal from the level sensor. The level sensor signal is used to control the maximum working height of the primary and secondary booms

Check mark

Note: A digital level will be required to perform this procedure

Check mark

Note: A kit is available through Genie Product Support (Genie part number 58351). This kit includes a digital level with a magnetic base and cable harnesses

Check mark

Note: A properly calibrated digital level is essential to proper machine calibration. Refer to the manufactures calibration information

Check mark

Note: Use the following chart to identify the description of each LCD screen control button used in this procedure

Check mark

Note: Perform this procedure with the booms in the fully stowed position and the axles fully extended

Check mark

1. Place the machine on a firm surface that has a side slope greater than 2° (6.5 inches / 16.5 cm) but less than 5° (16 inches / 40.6 cm)

Check mark

2. Place a digital level that has been calibrated to gravity on the X axis of the turntable

Run this procedureArrow right

250 Hourly Cummins Engine Maintanance

Check mark

- Check for leaks Oil, fuel and coolant systems

Check mark

- Drain Fuel-water separator

Check mark

- Check Oil level

Check mark

- Check Coolant level

Check mark

- Inspect Drive belt

Check mark

- Inspect Cooling fan

Check mark

- Replace Fuel filter

Check mark

- Vent Fuel supply lines

Check mark

- Vent Injection pump

Run this procedureArrow right

3 Monthly Boom Extend/Retract Cables Maintenance

Check mark

- Inspect and Adjust the Boom Extend/Retract Cables

Check mark

Genie specifications require that this procedure be performed quarterly for the first year of ownership or after the boom extend or retract cables have been replaced

Check mark

After the first year this quarterly inspection is not required. Refer to the Annual Inspection procedure appropriate for your machine

Check mark

Manufacturers specifications require that this procedure be performed by personnel that are competent in cable / wire rope inspection

Check mark

Note: Additional or more frequent inspections may be required due to the following:

Check mark

• exposed to hostile or corrosive environmental conditions

Check mark

• boom is overloaded

Check mark

• sustains a shock load

Check mark

• electrical arcing

Run this procedureArrow right

Parts for Genie Articulated Boom Lift Z-45 XC

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Digital Protractor

58377

Digital Level Kit

58351

O-ring Field Service Kit

49612

Digital Protractor

58377

Digital Level Kit

58351

O-ring Field Service Kit

49612

Digital Protractor

58377

Digital Level Kit

58351

O-ring Field Service Kit

49612

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Genie

Explore Other Assets