MaintainX Logo
EnterprisePricing
Genie

Genie Articulated Boom Lift Z-45/25 IC

Need answers fast?
Explore the manual using AI.

Genie Articulated Boom Lift Z-45/25 IC
Genie Articulated Boom Lift Z-45/25 IC

The Genie Articulated Boom Lift Z-45/25 IC is a versatile and reliable aerial work platform designed for efficient operation in various industrial applications. With its robust construction and advanced safety features, this boom lift ensures optimal performance and productivity on job sites. Ideal for both indoor and outdoor use, it provides exceptional reach and maneuverability.

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Genie Articulated Boom Lift Z-45/25 IC

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Genie Articulated Boom Lift Z-45/25 IC

Genie Articulated Boom Lift Z-45/25 IC

Create an account to install this asset package.

Maintenance Plans for Genie Articulated Boom Lift Model Z-45/25 IC

Integrate maintenance plans directly into your work orders in MaintainX.

1 Daily Deutz Engine Maintanance

Check mark

- Check / clean the oil cooler and cooling fins - Deutz D2011 and D436 Models

Check mark

- Replace Engine oil and filter

Check mark

- Replace Air filter

Check mark

- Check/adjust Valve clearance - Test/add Engine coolant

Check mark

- Inspect Air intake pipes

Check mark

- Inspect V-belts

Check mark

- Replace Fuel filter / separator;

Run this procedureArrow right

50 Hourly Perkins Engine Maintanance

Check mark

- Clean Air filter discharge valve

Check mark

- Check for leaks Oil, fuel and coolant systems

Check mark

- Inspect/adjust/replace Alternator belt

Check mark

- Check/Add Coolant level

Check mark

- Check Oil level

Check mark

- DrainFuel system filter/water separator

Check mark

- Check/Drain Engine air precleaner

Check mark

- Check Battery electrolyte level

Check mark

- Test/Add Cooling system supplement additive

Run this procedureArrow right

1 Daily GM 3.0L Engine Maintanance

Check mark

- Clean radiator

Check mark

- Drain/clean LPG vaporizer

Check mark

- Clean/replace air cleaner element

Check mark

- Replace engine oil and filter

Check mark

- Replace fuel filter

Check mark

- Replace air filter

Check mark

- Replace distributor cap

Check mark

- Replace spark plug wires;

Run this procedureArrow right

2000 Hourly Hydraulic Oil Maintenance

Check mark

- Test or Replace the Hydraulic Oil

Check mark

Replacement or testing of the hydraulic oil is essential for good machine performance and service life. Dirty oil and a clogged suction strainer or hydraulic filters may cause the machine to perform poorly and continued use may cause component damage. Extremely dirty conditions may require oil changes to be performed more frequently

Check mark

Note: Before replacing the hydraulic oil, the oil may be tested by an oil distributor for specific levels of contamination to verify that changing the oil is necessary. If the hydraulic oil is not replaced at the 2000 hour inspection, test the oil quarterly. Replace the oil when it fails the test

Check mark

Note: When removing a hose assembly or fitting, the O-ring (if equipped) on the fitting and/or hose end must be replaced. All connections must be torqued to specification during installation. Refer to Specifications, Hydraulic Hose and Fitting Torque Specifications

Check mark

Testing the oil:

Check mark

Complete the hydraulic oil testing with an oil distributor

Check mark

If the hydraulic oil passes testing at the 2000 hour maintenance interval, the oil must be tested every quarter by an oil distributor until the oil fails the test and is replaced

Check mark

If the hydraulic oil fails testing at the 2000 hour maintenance interval, the oil must be replaced

Check mark

After the oil has been replaced, continue the scheduled quarterly maintenance inspection

Run this procedureArrow right

250 Hourly Deutz Engine Maintanance

Check mark

- Check Oil level

Check mark

- Check Coolant level

Check mark

- Inspect/drain Oil, fuel and coolant systems - check for leaks Fuel system filter/water separator

Check mark

- Clean Air filter discharge valve

Check mark

- Inspect Exhaust system

Check mark

- Check / clean the oil cooler and cooling fins - Deutz D2011 and D436 Models

Check mark

- Replace Engine oil and filter

Check mark

- Replace Air filter

Check mark

- Check/adjust Valve clearance - Test/add Engine coolant

Run this procedureArrow right

Parts for Genie Articulated Boom Lift Z-45/25 IC

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Digital Protractor

58377

O-ring Field Service Kit

49612

Digital Level Kit

58351

Digital Protractor

58377

O-ring Field Service Kit

49612

Digital Level Kit

58351

Digital Protractor

58377

O-ring Field Service Kit

49612

Digital Level Kit

58351

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Genie

Explore Other Assets