

The Genie Articulated Boom Lift Z-34/22 N is a versatile aerial work platform designed for optimal performance in various industrial applications. Known for its compact design and exceptional reach, this boom lift ensures safety and efficiency on job sites, making it a reliable choice for contractors and maintenance professionals.
Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Genie Articulated Boom Lift Z-34/22 N
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
2000 Hourly Steer Axle Wheel Bearings Lubrication
- Grease the Steer Axle Wheel Bearings, All 2WD Models (except S-60, S-65, Z-60 DC/FE and Z-62)
Perform this procedure more often if dusty conditions exist
Maintaining the steer axle wheel bearings is essential for safe machine operation and service life. Operating the machine with loose or worn wheel bearings may cause an unsafe operating condition and continued use may result in component damage. Extremely wet or dirty conditions or regular steam cleaning and pressure washing of the machine may require that this procedure be performed more often
1. Loosen the wheel lug nuts. Do not remove them
2. Block the non-steer wheels, then center a lifting jack under the steer axle
3. Raise the machine 6 inches / 15 cm and place blocks under the drive chassis for support
4. Remove the lug nuts. Remove the tire and wheel assembly
5. Check for wheel bearing wear by attempting to move the wheel hub side to side, then up and down
• Result: There should be no side to side or up and down movement
3 Monthly Exhaust System Check
WARNING! Bodily injury hazard. Do not inspect while the engine is running. Remove the key to secure from operation
CAUTION! Burn hazard. Beware of hot engine components. Contact with hot engine components may result in severe burns
All nuts and bolts are tight
All welds are free of cracks
No exhaust leaks detected, i.e., no carbon buildup around seams and joints
Sign off on the exhaust system check
2000 Hourly / 3 Monthly Hydraulic Oil Maintenance
Hydraulic Oil Inspection
Visual inspection of hydraulic oil color (should be a clear, light-honey color)
Visual inspection of hydraulic oil appearance (should be clear and not cloudy or visibly distorts the view through the sight glass or container)
Visual inspection of hydraulic oil for particles, foreign objects, or other contamination
Smell test of hydraulic oil (can smell 'hot' but not 'burnt')
Feel test of hydraulic oil (should feel viscous and free of any rough feel due to particles)
If the hydraulic oil fails any of the above inspections, the hydraulic oil must be tested by an oil distributor or replaced
Note: If the hydraulic oil was not replaced at or before the 2000 hour maintenance interval, the oil must be tested every quarter by an oil distributor until the oil fails the test and is replaced
After the oil has been replaced, continue the scheduled quarterly maintenance inspection
3 Monthly Aircraft Protection System Test
Start this procedure with the machine in the fully stowed position
Turn the key switch to platform control and pull out the red Emergency Stop button to the on position at both the ground and platform controls
Start the engine from the platform controls
Move the yellow bumper at the bottom of the platform 4 inches/10 cm in any direction
Activate each function control handle or toggle switch
Extend the primary boom approximately 3 ft / 1 m
Move the yellow bumper at the bottom of the platform 4 inches/10 cm in any direction
Activate each function control handle or toggle switch
Activate and hold the aircraft protection override switch
3 Monthly Drive Speed ALC1000 Test
- Test the Drive Speed - Raised or Extended Position, ALC1000 Models
Proper drive function is essential to safe machine operation. The drive function should respond quickly and smoothly to operator control
Drive performance should also be free of hesitation, jerking and unusual noise over the entire proportionally controlled speed range
Note: Perform this procedure with the machine on a firm, level surface that is free of obstructions
This maintenance procedure applies to the following models: S-100, S-105, S-120, S-125, SX-105 XC, SX-125 XC, SX-135 XC, S-100HD, S-120HD, SX-150, SX-180, 2-80/60, Z-135/70 and ZX-135/70
S-100, S-105, S-120, S-125, SX-105 XC, SX-125 XC, SX-135 XC, S-100HD and S-120HD
1. Create start and finish lines by marking two lines on the ground 40 feet / 12.2 m apart
2. Raise the boom to a horizontal position
3. Extend the primary boom until the envelope alarm and LED are activated
Access the parts list for your equipment in MaintainX.
Digital Protractor
58377
Digital Level Kit
58351
O-ring Field Service Kit
49612
Digital Protractor
58377
Digital Level Kit
58351
O-ring Field Service Kit
49612
Digital Protractor
58377
Digital Level Kit
58351
O-ring Field Service Kit
49612
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













