

The Genie Articulated Boom Lift Z-25/8 is a versatile aerial work platform designed for efficient access to elevated work areas. Known for its robust performance and reliability, this boom lift is ideal for construction, maintenance, and industrial applications, ensuring safety and productivity at height.
Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Genie Articulated Boom Lift Z-25/8
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
3 Monthly Exhaust System Check
WARNING! Bodily injury hazard. Do not inspect while the engine is running. Remove the key to secure from operation
CAUTION! Burn hazard. Beware of hot engine components. Contact with hot engine components may result in severe burns
All nuts and bolts are tight
All welds are free of cracks
No exhaust leaks detected (i.e., no carbon buildup around seams and joints)
Sign off on the exhaust system check
250 Hourly Deutz Engine Maintanance
- Check Oil level
- Check Coolant level
- Inspect/drain Oil, fuel and coolant systems - check for leaks Fuel system filter/water separator
- Clean Air filter discharge valve
- Inspect Exhaust system
- Check / clean the oil cooler and cooling fins - Deutz D2011 and D436 Models
- Replace Engine oil and filter
- Replace Air filter
- Check/adjust Valve clearance - Test/add Engine coolant
1 Yearly Key Switch Test
This maintenance procedure applies to the following models: S-100, S-100HD, S-105, S-120, S-120HD, S-125, SX-105 XC, SX-125 XC, SX-135 XC, SX-150, SX-180, Z-80/60, Z-135/70 and Zx-135/70
There are two key switches on the machine - the Main key switch and the Bypass/Recovery key switch
Note: Perform this procedure on a firm, level surface with the machine in the stowed position
Open the ground controls side turntable side cover
Pull out the red Emergency Stop button to the on position at both the ground and platform controls
At the ground controls, turn the bypass/recovery key switch to the run position
Turn the main key switch to ground control, start the engine and then turn the key switch to platform control
Check any machine function from the ground controls. The machine functions should not operate
Turn the main key switch to ground control
2000 Hourly Engine Maintenance
- Perform Engine Maintenance
Required maintenance procedures and additional engine information are available in the manufacturer's manuals. Refer to Specifications, Engine Operator and Maintenance Manuals
Cummins Models:
• Cooling system - flush
• Valve clearance - check/adjust
GM .998L:
• Spark plug wires - replace
• Timing belt - replace
• Bolts, nuts and fasteners - check/tighten
1 Yearly Turntable Rotation Bearing Bolts Check
- Check the Turntable Rotation Bearing Bolts
Maintaining proper torque on the turntable bearing bolts is essential to safe machine operation
Improper bolt torque could result in an unsafe operating condition and component damage
Note: Access to the upper and lower turntable bearing bolts will vary depending on model
1. S Booms, Z-45 XC and Z-45/25 (J) IC, DC, Bi-Energy: Raise the (primary) boom and place a safety chock on the lift cylinder rod
Carefully lower the boom onto the lift cylinder safety chock OR support the boom assembly with a suitable lifting device
All other Z Booms: Raise the secondary boom and place a safety chock on the lift cylinder rods. Carefully lower the boom onto the lift cylinder safety chock OR support the boom assembly with a suitable lifting device
WARNING!
Crushing hazard. Keep hands away from the cylinder and all moving parts when lowering the boom
Access the parts list for your equipment in MaintainX.
Digital Protractor
58377
Digital Level Kit
58351
O-ring Field Service Kit
49612
Digital Protractor
58377
Digital Level Kit
58351
O-ring Field Service Kit
49612
Digital Protractor
58377
Digital Level Kit
58351
O-ring Field Service Kit
49612
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













