MaintainX Logo
EnterprisePricing
Genie

Genie Articulated Boom Lift Z-20N RJ

Need answers fast?
Explore the manual using AI.

Genie Articulated Boom Lift Z-20N RJ
Genie Articulated Boom Lift Z-20N RJ

The Genie Articulated Boom Lift Z-20N RJ is a versatile aerial work platform designed for optimal reach and maneuverability in tight spaces. Known for its reliability and ease of use, this Genie model is ideal for construction, maintenance, and industrial applications, ensuring safety and efficiency on the job site.

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Genie Articulated Boom Lift Z-20N RJ

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Genie Articulated Boom Lift Z-20N RJ

Genie Articulated Boom Lift Z-20N RJ

Create an account to install this asset package.

Maintenance Plans for Genie Articulated Boom Lift Model Z-20N RJ

Integrate maintenance plans directly into your work orders in MaintainX.

3 Monthly Ground Control Override Test

Check mark

Warning: This test requires trained personnel with PPE!

Check mark

Push in the platform red Emergency Stop button to the off position

Check mark

Turn the key switch to ground controls

Check mark

Pull out the red Emergency Stop button to the on position at the ground controls

Check mark

From the ground controls, operate each boom function through a partial cycle

Check mark

From the platform, activate the foot switch and operate each boom function

Check mark

Pull out the red Emergency stop button to the on position at the platform controls

Check mark

Activate the foot switch and operate each boom function

Check mark

Sign off on the ground control override test

Run this procedureArrow right

3 Monthly Battery Inspection

Check mark

WARNING! Electrocuting/burn hazard. Remove all rings, watches and other jewelry.

Check mark

WARNING! Bodily injury hazard. Batteries contain acid. Avoid spilling or contacting battery acid.

Check mark

Neutralize battery acid spills with baking soda and water.

Check mark

Note: Fully charge the batteries and allow the batteries to rest 24 hours before performing this procedure to allow the battery cells to equalize.

Check mark

Open the side covers

Check mark

Battery cable connections are free of corrosion

Check mark

Note: Adding terminal protectors and a corrosion preventative sealant will help eliminate corrosion on the battery terminals and cables.

Check mark

Battery retainers and cable connections are tight

Check mark

Battery separator wire connections are tight (if equipped)

Run this procedureArrow right

1 Yearly Dual Capacity And Platform Overload System Z-45 XC Test

Check mark

Warning: This procedure requires trained personnel. Perform this procedure with the boom fully retracted and in the stowed position and with the machine on a firm, level surface.

Check mark

All weight, tools, accessories and equipment removed from the platform?

Check mark

Key switch turned to ground control and red Emergency Stop button pulled out to the on position at both ground and platform controls?

Check mark

Enter the weight of the test weight placed in the center of the platform

Check mark

Unrestricted range of motion indicator light is on at the ground controls?

Check mark

Restricted range of motion light is on at the ground controls?

Check mark

Primary boom fully extended and retracted?

Check mark

Enter the additional weight added to the platform

Check mark

Restricted range of motion indicator light is on at the ground controls?

Run this procedureArrow right

250 Hourly Deutz Engine Maintanance

Check mark

Check Oil level

Check mark

Check Coolant level

Check mark

Inspect/drain Oil, fuel and coolant systems - check for leaks Fuel system filter/water separator

Check mark

Clean Air filter discharge valve

Check mark

Inspect Exhaust system

Check mark

Check / clean the oil cooler and cooling fins - Deutz D2011 and D436 Models

Check mark

Replace Engine oil and filter

Check mark

Replace Air filter

Check mark

Check/adjust Valve clearance

Run this procedureArrow right

3 Monthly Exhaust System Check

Check mark

WARNING! Bodily injury hazard. Do not inspect while the engine is running. Remove the key to secure from operation

Check mark

CAUTION! Burn hazard. Beware of hot engine components. Contact with hot engine components may result in severe burns

Check mark

All nuts and bolts are tight

Check mark

All welds are free of cracks

Check mark

No exhaust leaks detected, i.e., no carbon buildup around seams and joints

Check mark

Sign off on the exhaust system check

Run this procedureArrow right

Parts for Genie Articulated Boom Lift Z-20N RJ

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

O-ring Field Service Kit

49612

Digital Level Kit

58351

Digital Protractor

58377

O-ring Field Service Kit

49612

Digital Level Kit

58351

Digital Protractor

58377

O-ring Field Service Kit

49612

Digital Level Kit

58351

Digital Protractor

58377

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Genie

Explore Other Assets