MaintainX Logo
EnterprisePricing
Genie

Genie Articulated Boom Lift Z-20N RJ

Need answers fast?
Explore the manual using AI.

Genie Articulated Boom Lift Z-20N RJ
Genie Articulated Boom Lift Z-20N RJ

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Genie Articulated Boom Lift Z-20N RJ

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Genie Articulated Boom Lift Z-20N RJ

Genie Articulated Boom Lift Z-20N RJ

Create an account to install this asset package.

Maintenance Plans for Genie Articulated Boom Lift Model Z-20N RJ

Integrate maintenance plans directly into your work orders in MaintainX.

3 Monthly Safety Envelope And Circuit Test

Check mark

Testing the machine safety envelope is critical to safe machine operation. If the boom is allowed to operate when a safety switch is not functioning correctly, the machine stability is compromised and may tip over

Check mark

For limit switch and angle sensor information, Refer to appropriate Service and Repair Manual for your machine

Check mark

Note: Use the following chart to identify the description of each LCD screen control button used in this procedure

Check mark

Secondary Boom #1 Angle Safety Limit Switch, LSS2AS

Check mark

Turn the key switch to ground control and pull out the red Emergency Stop button to the on position at both ground and platform controls

Check mark

Start the engine from the ground controls

Check mark

Press the (plus)(minus) buttons on the LCD screen to activate status mode

Check mark

Press the enter or previous button on the LCD screen until secondary boom length is displayed

Check mark

Fully raise the secondary boom and extend the secondary boom approximately 2 feet / 61 cm

Run this procedureArrow right

2000 Hourly / 3 Monthly Hydraulic Oil Maintenance

Check mark

Inspect Visually of the Hydraulic Oil

Check mark

Is the hydraulic oil a clear, light-honey color?

Check mark

Is the hydraulic oil clear and not cloudy or visibly distorting the view through the sight glass or container?

Check mark

Does the hydraulic oil contain no particles, foreign objects, or other contamination?

Check mark

Does the hydraulic oil smell 'hot' but not 'burnt'?

Check mark

Does the hydraulic oil feel viscous and free of any rough feel due to particles when rubbed between fingers?

Check mark

If the hydraulic oil fails any of the above inspections, the hydraulic oil must be tested by an oil distributor or replaced.

Check mark

Note: If the hydraulic oil was not replaced at or before the 2000 hour maintenance interval, the oil must be tested every quarter by an oil distributor until the oil fails the test and is replaced.

Check mark

After the oil has been replaced, continue the scheduled quarterly maintenance inspection.

Run this procedureArrow right

100 Hourly GM .998L Engine Maintanance

Check mark

Check Coolant level

Check mark

Check Oil level

Check mark

Check for leaks Oil, fuel and coolant systems

Check mark

Replace engine oil and filter

Check mark

Drain/clean LPG vaporizer

Check mark

Check PCV valve

Check mark

Clean/replace air cleaner element

Check mark

Check timing belt

Check mark

Check electrical wiring for chafing or damage

Run this procedureArrow right

3 Monthly Emergency Power System Test

Check mark

Turn the key switch to ground control and pull out the red Emergency Stop button to the on position at both the ground and platform controls

Check mark

At the ground controls, break the security tie and lift the emergency power switch cover (if equipped)

Check mark

Simultaneously hold the emergency power switch on and operate each boom function through a partial cycle

Check mark

Close the emergency power switch cover and secure the cover with a security tie (if equipped)

Check mark

Turn the key switch to platform controls

Check mark

At the platform controls, break the security tie and lift the emergency power switch cover (if equipped)

Check mark

Press down on the foot switch and simultaneously hold the emergency power switch on and operate each boom function through a partial cycle

Check mark

Close the emergency power switch cover and secure the cover with a security tie (if equipped)

Check mark

Sign off on the emergency power system test

Run this procedureArrow right

3 Monthly Boom Angle Sensor Test

Check mark

- Test the Primary Boom Angle Sensor - SX-105 XC, SX-125 XC, SX-135 XC, SX-150 and SX-180

Check mark

A properly functioning primary boom angle sensor is essential to safe machine operation. The ECM at the ground controls (TCON) monitors the position and angle of the primary boom using the signal from the primary boom angle sensor

Check mark

The primary boom angle sensor signal is used to control the ramping of the primary boom, limiting the speed of the primary boom to 2.3 feet / 0.7 meters per second

Check mark

Note: The turntable level sensor must be tested before starting this procedure. Refer to Maintenance Procedures, Test the Turntable Level Sensor

Check mark

Note: A digital level will be required to perform this procedure

Check mark

Note: A kit is available through Genie Product Support (Genie part number 58351). This kit includes a digital level with a magnetic base and cable harnesses

Check mark

Note: A properly calibrated digital level is essential to proper machine calibration. Refer to the manufactures calibration information

Check mark

Note: Use the following chart to identify the description of each LCD screen control button used in this procedure

Check mark

Note: Perform this procedure with the booms in the fully stowed position and the axles fully extended

Run this procedureArrow right

Parts for Genie Articulated Boom Lift Z-20N RJ

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Digital Level Kit

58351

Digital Protractor

58377

O-ring Field Service Kit

49612

Digital Level Kit

58351

Digital Protractor

58377

O-ring Field Service Kit

49612

Digital Level Kit

58351

Digital Protractor

58377

O-ring Field Service Kit

49612

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Genie

Explore Other Assets