MaintainX Logo
EnterprisePricing
Genie

Genie Articulated Boom Lift S-65

Need answers fast?
Explore the manual using AI.

Genie Articulated Boom Lift S-65
Genie Articulated Boom Lift S-65

The Genie Articulated Boom Lift S-65 is a versatile aerial work platform designed for enhanced reach and maneuverability. Ideal for construction and maintenance tasks, this model combines robust performance with safety features, ensuring efficient operation in various environments. Trust Genie for reliable access solutions.

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Genie Articulated Boom Lift S-65

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Genie Articulated Boom Lift S-65

Genie Articulated Boom Lift S-65

Create an account to install this asset package.

Maintenance Plans for Genie Articulated Boom Lift Model S-65

Integrate maintenance plans directly into your work orders in MaintainX.

1 Yearly Dual Capacity And Platform Overload System Z-45 XC Test

Check mark

Warning: This procedure should be performed with the boom fully retracted and in the stowed position and with the machine on a firm, level surface

Check mark

All weight, tools, accessories and equipment removed from the platform

Check mark

Key switch turned to ground control and red Emergency Stop button pulled out to the on position at both ground and platform controls

Check mark

Test weight of 600 lbs / 272kg placed in the center of the platform and secured

Check mark

Unrestricted range of motion indicator light is on at the ground controls

Check mark

Restricted range of motion light is on at the ground controls

Check mark

Primary boom fully extended and retracted

Check mark

Additional 100 lbs / 45kg added to the platform

Check mark

Restricted range of motion indicator light is on at the ground controls

Run this procedureArrow right

3 Monthly Safety Envelope Limit Switch Test

Check mark

- Test the Safety Envelope Limit Switches, Z-135/70, ZX-135/70, SX-105 XC, SX-125 XC, SX-135 XC, SX-150 and SX-180 Models

Check mark

Testing the machine envelope safety limit switches is critical to safe machine operation. If the boom is allowed to operate when a safety switch is not functioning correctly, the machine stability could be compromised and may tip over

Check mark

Note: Perform this procedure with the boom in the stowed position

Check mark

Note: Perform this procedure with the axles extended

Check mark

Note: Two people will be required to perform this procedure

Check mark

Note: Use the following chart to identify the description of each LCD screen control button used in this procedure

Check mark

Z-135/70 and ZX-135/70 Models:

Check mark

Secondary Boom #1 Retracted Safety Limit Switch, LSS1RS

Check mark

1. Working at the platform end of the turntable, support and secure the lower turntable riser end cover to a suitable lifting device

Run this procedureArrow right

1 Daily Kubota Engine Maintanance

Check mark

Daily Maintenance Tasks

Check mark

Sign off on the daily maintenance

Run this procedureArrow right

1 Daily Ford Engine Maintanance

Check mark

Check for leaks, damage or deterioration Oil, coolant, fuel, exhaust and vacuum hoses

Check mark

Check for chafing or damage Electrical wiring

Check mark

Check/adjust Engine belts

Check mark

Check/replace Fuel Filters

Check mark

Replace Engine oil

Check mark

Replace Oil filter

Check mark

Replace Air filter

Check mark

Clean/Adjust/Replace Spark plugs

Check mark

Tighten/Replace Loose or missing fasteners

Run this procedureArrow right

50 Hourly Perkins Engine Maintanance

Check mark

- Clean Air filter discharge valve

Check mark

- Check for leaks Oil, fuel and coolant systems

Check mark

- Inspect/adjust/replace Alternator belt

Check mark

- Check/Add Coolant level

Check mark

- Check Oil level

Check mark

- DrainFuel system filter/water separator

Check mark

- Check/Drain Engine air precleaner

Check mark

- Check Battery electrolyte level

Check mark

- Test/Add Cooling system supplement additive

Run this procedureArrow right

Parts for Genie Articulated Boom Lift S-65

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Digital Protractor

58377

Digital Level Kit

58351

O-ring Field Service Kit

49612

Digital Protractor

58377

Digital Level Kit

58351

O-ring Field Service Kit

49612

Digital Protractor

58377

Digital Level Kit

58351

O-ring Field Service Kit

49612

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Genie

Explore Other Assets