Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Flowserve Pump MK3 HSI 3×2-8
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Bearing Housing Cleaning
5.2.2.1 Regreasable
Check for contaminants in the bearing housing
Drain the oil from the bearing housing
Send oil sample for analysis
Was the oil contaminated?
If contaminated, describe the cause and corrective actions taken
Ensure the work area is clean and free from dust, dirt, oil, grease
Use only clean materials
Use non-flammable, non-contaminated cleaning fluids
3 Monthly Bearing Housing Oil Change
Oil Bath Lubrication
Verify operating conditions
Record external housing temperature
Record bearing temperature
Verify oil specifications
Is the lubricant Mobil DTE heavy/medium or equivalent?
Clean the vent plug [6521]
Remove the vent plug [6521]
Pour oil into the housing
Bearing Housing Oil Level Check
6.1 Maintenance schedule
Record the bearing lubricant level
Enter the remaining hours before a lubricant change is required
Is the oil level within the circumference of the center hole of the sight glass?
Is oil visible in the constant level oiler bottle at all times?
Check and fill the oil level when the pump is not operating
Pump Overhaul Inspection
6.8 Examination of parts
Ensure all parts are thoroughly cleaned and inspected
Use new bearings, O-rings, gaskets, and lip seals
Replace any parts showing wear or corrosion with new genuine Flowserve parts
Measure shaft runout and ensure it is 0.025 mm (0.001 in.) FIM or less
Check radial deflection — static and ensure movement is not more than 0.05 mm (0.002 in.)
Verify axial shaft movement (endplay) on a Durco pump is 0.03 mm (0.001 in.) or less
Ensure seal chamber face squareness run-out is less than 0.08 mm (0.003 in.)
Check seal chamber register concentricity is less than 0.13 mm (0.005 in.)
Coupling Alignment Check
6.1 Maintenance schedule / 4.8 Final shaft alignment check
Check coupling alignment and re-align if necessary.
Operate the pump for at least an hour or until it reaches final operating temperature.
Shut the pump down and recheck alignment while the pump is hot.
Did piping thermal expansion change the alignment?
Realign pump as necessary.
Measure parallel misalignment (should be no more than 0.05 mm or 0.002 in.).
Measure angular misalignment (should be no more than 0.0005 mm/mm or 0.0005 in./in.).
Place an indicator on the coupling, reading in the vertical direction, and measure movement when any driver fastener is loosened (should not indicate more than 0.05 mm or 0.002 in.).
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX