

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Bradford White Water Heater EF60T150E3N2
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Anode Rod Inspection
Service Procedure XIV — Anode Inspection and Replacement
Turn off the water supply and drain the water heater
Disassemble the heater for access to anodes and flue baffles
Locate and remove the anode rods using a 1-1/16 in. hex socket
Visually inspect each anode rod for depletion
Apply thread sealing tape or compound and reinstall the anode rods
Restore the water supply and check for leaks
Reinstall the collector cover
Reinstall the collector insulation and control panel
Spark Rod Gap Inspection
Service Procedure IX — Spark Rod Gap Inspection and Adjustment (Direct Spark Ignition models)
Remove the combustion system per the Combustion System Removal procedure
Measure the spark gap between the spark rod and burner tube
Is the spark gap within the acceptable range of 3/16 in. to 1/4 in.?
Adjust the spark rod if the gap is out of range
Re-measure the spark gap to confirm it is within 3/16 in. to 1/4 in. after adjustment
Reinstall the combustion system
Check several ignitions to confirm the burner lights smoothly
Flame Sensor Testing
Service Procedure VIII — Flame Sensor Testing & Replacement
WARNING — 120-volt potential exposure; the flame sensor may be too hot to handle, so use caution.
Check for a minimum of 1 microamp during the 1.5-second flame-proving period
Is the flame-sensing circuit okay?
Check for the expected 24VAC at the ignition module/control board flame-establishing terminals
Is 24VAC present at the ignition module/control board flame-establishing terminals?
Call technical support if 24VAC is absent
With the sensor disconnected, check for continuity to ground
Replace the sensor and/or wire lead if continuity to ground is present
Burner Tube Inspection
Service Procedure III — Burner Tube Inspection & Replacement
Take precautions to avoid injury as heater components can be hot during this procedure
Burner Tube Removal
Turn the main power switch off and unplug the water heater, then turn off the gas supply
Remove the surround cover, then disconnect the gas connection, PVC venting, wire harness, and silicone tubing from the gas valve
Disconnect the wire harness from the blower assembly
Remove the two screws holding the hot surface igniter and flame sensor and carefully remove them (for Direct Spark Ignition models, remove the spark rod bracket screws and spark rod instead)
Remove the four nuts holding the burner transition, lift the blower/gas valve/transition assembly off, and set the gasket aside
Remove the burner tube from the burner mounting insert
Blower Testing
Service Procedure V — Blower Testing & Replacement
Confirm the blower energizes when the thermostat calls for heat
Check for 120VAC across the terminal-block black and white wires
Check for 120VAC at the ignition module/control board and blower wiring
Repair or replace the harness or blower as indicated
Check amp draw on the black blower-motor lead (should read 0.6–3.0 amps)
Is the blower wheel secure on the motor shaft?
Replace the blower if draw is out of range or the wheel is loose
Confirm safety circuits are in their normal position
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













