

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Bradford White Water Heater EF60T1253XA2
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Hot Surface Igniter Testing
Service Procedure VII — Hot Surface Igniter Testing & Replacement
WARNING — 120-volt potential exposure; the igniter may be too hot to handle, so use caution.
Igniter Testing
Check the igniter's cold resistance
Is the igniter's cold resistance under 150 ohms?
Replace the hot surface igniter if resistance is not under 150 ohms
Check for 120VAC across the ignition module's igniter terminals during the warm-up period (igniter LED lit)
Is voltage present across the ignition module's igniter terminals?
Check the harness connection if voltage is absent
Combustion System Testing
Service Procedure II — Combustion System Testing
Observe burner operation through the sight glass
Verify minimum gas supply piping size
Confirm static inlet gas pressure is stable between 7 and 14 in. W.C.
For models with Hot Surface Ignition
Confirm the inlet gas pressure does not drop more than 2 in. W.C. during ignition
Check that the igniter glows through the sight glass during warm-up
Check for 120VAC at the ignition-module igniter terminals
Check igniter cold resistance is under 150 ohms
Intake Pressure Switch Testing
Service Procedure XII — Intake Pressure Testing (models prior to serial "CF" only)
Check continuity through the normally closed intake pressure switch if the blower does not energize
Replace the intake pressure switch if faulty
Refer to the vent safety switch, exhaust pressure switch, or blower testing procedures if the blower does not energize
Check continuity through the switch if the purge LED does not illuminate within the expected time
Confirm the inlet tube pressure tap reads at least -1.2 in. W.C. using a manometer
Remove the hose from the intake pressure switch and restart the heater to see if the purge LED illuminates
Isolate the heater from the intake vent system and restart again to isolate a switch versus vent-system fault
Check whether the intake vent system is obstructed and clear any obstruction found
Blower Testing
Service Procedure V — Blower Testing & Replacement
WARNING — 120-volt potential exposure; use caution making voltage checks.
Confirm the blower energizes when the thermostat calls for heat
Check for 120VAC across the terminal-block black and white wires
Check for 120VAC at the ignition module/control board and blower wiring
Repair or replace the harness or blower as indicated
Does the blower energize but seem weak?
Check amp draw on the black blower-motor lead (should read 0.6–3.0 amps)
Confirm the blower wheel is secure on the motor shaft
Burner Tube Inspection
Service Procedure III — Burner Tube Inspection & Replacement
Burner Tube Removal
Turn the main power switch off and unplug the water heater, then turn off the gas supply.
Remove the surround cover, then disconnect the gas connection, PVC venting, wire harness, and silicone tubing from the gas valve.
Disconnect the wire harness from the blower assembly.
Remove the two screws holding the hot surface igniter and flame sensor and carefully remove them (for Direct Spark Ignition models, remove the spark rod bracket screws and spark rod instead).
Remove the four nuts holding the burner transition, lift the blower/gas valve/transition assembly off, and set the gasket aside.
Remove the burner tube from the burner mounting insert.
Burner Tube Inspection
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













