MaintainX Asset Hub logo
EnterprisePricing
BINDER

BINDER Incubator BD-S-UL 115

Need answers fast?
Explore the manual using AI.

BINDER Incubator BD-S-UL 115
BINDER Incubator BD-S-UL 115

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

BINDER Incubator BD-S-UL 115

BINDER Incubator BD-S-UL 115

Create an account to install this asset package.

Maintenance Plans for BINDER Incubator Model BD-S-UL 115

Integrate maintenance plans directly into your work orders in MaintainX.

Safety Controller Check

Check mark

Pre-Check Guidelines

Check mark

Ensure compliance with applicable regulations (e.g., DGUV guidelines 213-850 for Germany).

Check mark

Identify the chamber type and corresponding safety controller class

Check mark

Safety Controller Function Check

Check mark

Is the safety controller set-point approximately 2 °C to 5 °C above the desired temperature set-point?

Check mark

Perform a functionality check of the safety controller.

Check mark

Post-Check Actions

Check mark

Was an alarm message visually reported during the check?

Check mark

Describe any issues encountered during the check.

Run this procedureArrow right

1 Yearly Chamber Maintenance

Check mark

Safety Precautions

Check mark

Ensure the following safety measures are in place before starting maintenance

Check mark

Is the maintenance work being conducted by licensed electricians or authorized experts?

Check mark

Is the chamber disconnected from power?

Check mark

Maintenance Work

Check mark

Perform regular maintenance work at least once a year

Check mark

Are the legal requirements met regarding the qualifications of service personnel, scope of testing, and documentation?

Check mark

Replace the door gasket when cold

Check mark

Consult BINDER Service for maintenance agreement recommendations

Run this procedureArrow right

Chamber Cleaning

Check mark

Preparation

Check mark

Disconnect the chamber from the power supply

Check mark

Disconnect the power plug

Check mark

Cleaning Process

Check mark

Select cleaning agents for different surfaces

Check mark

Use the neutral cleaning agent Art. No. 1002-0016 where recommended

Check mark

Avoid using acidic or chlorine cleaning detergents

Check mark

Avoid using soapsuds for cleaning

Check mark

Remove cleaning agents completely from surfaces with a moistened towel

Run this procedureArrow right

Chamber Decontamination

Check mark

Preparation

Check mark

Disconnect the chamber from the power supply by pulling the power plug.

Check mark

Ensure that decontamination agents do not react with device components or charging material.

Check mark

Decontamination Options

Check mark

Select the decontamination procedure based on contamination type and charging material.

Check mark

Safety Precautions

Check mark

Use adequate personal safety controls during decontamination.

Check mark

Wear sealed protective goggles to protect eyes from chemical burns.

Check mark

Post Decontamination

Run this procedureArrow right

Parts for BINDER Incubator BD-S-UL 115

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Rack, Chrome-Plated (Chamber Size 115)

6004-0210

Door Gasket, Silicone (Chamber Size 115)

6005-0288

Stable Table On Wheels With Castors And Locking Brakes

9051-0005

Chamber Fuse 5X20Mm 250V 6.3 A Time Lag (T)

5006-0092

Chamber Fuse 5X20Mm 250V 12.5 A Time Lag (T) For UL Chambers

5006-0096

Rack, Chrome-Plated (Chamber Size 115)

6004-0210

Door Gasket, Silicone (Chamber Size 115)

6005-0288

Stable Table On Wheels With Castors And Locking Brakes

9051-0005

Chamber Fuse 5X20Mm 250V 6.3 A Time Lag (T)

5006-0092

Chamber Fuse 5X20Mm 250V 12.5 A Time Lag (T) For UL Chambers

5006-0096

Rack, Chrome-Plated (Chamber Size 115)

6004-0210

Door Gasket, Silicone (Chamber Size 115)

6005-0288

Stable Table On Wheels With Castors And Locking Brakes

9051-0005

Chamber Fuse 5X20Mm 250V 6.3 A Time Lag (T)

5006-0092

Chamber Fuse 5X20Mm 250V 12.5 A Time Lag (T) For UL Chambers

5006-0096

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from BINDER

Explore Other Assets