
Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

BINDER Incubator BD 23
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Yearly Chamber Maintenance
DANGER - Electrical hazard. Danger of death.
Safety Precautions
Ensure the unit does NOT become wet during operation or maintenance work.
Do NOT remove the rear panel of the unit.
Disconnect the unit before conducting maintenance work.
Disconnect the power plug.
Ensure all maintenance work is conducted by licensed electricians or experts authorized by BINDER.
Maintenance Work
Was the maintenance work performed by authorized personnel?
Chamber Temperature Safety Device Check
Pre-Check Guidelines
Observe guideline BGI/GUV-I 850-0 on safe working in laboratories.
Safety Device Class 2 Check
Turn the control knob (7) counter-clockwise until the chamber turns off.
Did the indicator lamp (7a) light up and the buzzer sound?
Press the reset button (7b) to release the safety device.
Turn on the chamber as described.
Safety Device Class 3.1 Check
Turn the control knob (7) to its end-stop (position 10) for chamber protection.
Chamber Decontamination
Safety Precautions
Disconnect the chamber from the power supply
Pull the power plug
Use adequate personal safety controls
Decontamination Methods
Select the decontamination method
Remove all inflammable goods from the interior before hot air sterilization
Ensure the unit is absolutely dry and ventilated before start-up after spraying disinfectant
Sterilize inner chamber parts in a sterilizer or autoclave if removed
Initial Equipment Check
Unpacking and Initial Inspection
Unpack the equipment carefully
Check the chamber and optional accessories for completeness based on the delivery receipt
Is there any transportation damage?
Post-Unpacking Actions
Remove any transportation protection devices and adhesives from the chamber and doors
Take out the operating manuals and accessory equipment
Safety Precautions
Ensure the chamber is lifted from the pallet at its four lower corners with the aid of 2 people
Safety Controller Check
Functionality Check
Verify the functionality of the safety controller
Is the safety controller functioning properly?
Temperature Set-Point Verification
Enter the current temperature set-point of the safety controller
Enter the desired temperature set-point
Set the safety controller set-point 2°C to 5°C above the desired temperature set-point
Is the safety controller set-point correctly adjusted above the desired temperature set-point?
Access the parts list for your equipment in MaintainX.
Rack, Chrome-Plated
6004-0050
Rack, Stainless Steel
6004-0051
Rack, Perforated, Stainless Steel
6004-0052
Door Gasket, Silicone
6005-0090
Unit Fuse 5X20Mm 250V 10A Semi Time Lag (M)
5006-0012
Rack, Chrome-Plated
6004-0050
Rack, Stainless Steel
6004-0051
Rack, Perforated, Stainless Steel
6004-0052
Door Gasket, Silicone
6005-0090
Unit Fuse 5X20Mm 250V 10A Semi Time Lag (M)
5006-0012
Rack, Chrome-Plated
6004-0050
Rack, Stainless Steel
6004-0051
Rack, Perforated, Stainless Steel
6004-0052
Door Gasket, Silicone
6005-0090
Unit Fuse 5X20Mm 250V 10A Semi Time Lag (M)
5006-0012
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













