

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Advantage Temperature Controller SRV-675
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Heater Contactor and Pump Motor Starter Inspection
Inspect heater contactor for wear or pitting
Inspect pump motor starter for wear or pitting
Check for overheating signs on components
Replace heater contactor if wear or pitting is found
Replace pump motor starter if wear or pitting is found
Verify all components are functioning properly after inspection
Record any issues found during inspection
Technician signature
Pump Seal Replacement
Preparation
Disengage process operations and relieve all system pressure.
Disengage main power supply and verify the Power light on the display is 'off'.
Accessing the Pump
Remove the lift-off access panel and set aside.
Remove the necessary panels to gain access to the pump motor.
Draining and Disconnecting
Drain machine by removing the pump casing drain plug.
Remove the three motor wire leads from the motor wiring terminals and map the wire terminal locations.
Heater Replacement
Preparation
Disengage operations and ensure all system pressure is relieved
Verify the unit’s pressure gauges read '0'
Disengage main power supply
Verify the Power light on the display is 'off'
Access and Drainage
Remove the lift-off access panel and set aside
Drain machine by removing the pump casing drain plug
Heater Disconnection
Voltage Change
Pre-Conversion Consultation
Consult with Advantage Service Department to determine if your unit can be converted. Record the outcome.
Typical Conversions
Select the conversion type
Items Requiring Replacement or Rewiring
Check items that require replacement or rewiring
Field Voltage Changeover Procedure
Disengage operations and verify all system pressure is relieved and the unit’s pressure gauges read '0'.
Disengage main power supply and verify the Power light on the display is 'off'.
Initial Equipment Check
Unboxing and Initial Inspection
Unbox the unit before accepting delivery
Check for visible damage
Documentation of Damage
Was there any visible damage?
Take photographs of any suspected damage
Describe the damage in detail
Follow proper procedures for damage claims
Keep detailed records of the damage and claims process
Access the parts list for your equipment in MaintainX.
Case 119, Iron, 1.25x1.25 with Integral Tanks
771640
Case 119S, Stainless SS304, 1.25x1.25 with Integral Tanks
771641
Impeller 503, Composite, 4.18", 0.5 HP
4310560
Impeller 503, Composite, 4.34", 0.75 HP
4310561
Impeller 503, Composite, 4.50", 1.0 HP
4310562
Case 119, Iron, 1.25x1.25 with Integral Tanks
771640
Case 119S, Stainless SS304, 1.25x1.25 with Integral Tanks
771641
Impeller 503, Composite, 4.18", 0.5 HP
4310560
Impeller 503, Composite, 4.34", 0.75 HP
4310561
Impeller 503, Composite, 4.50", 1.0 HP
4310562
Case 119, Iron, 1.25x1.25 with Integral Tanks
771640
Case 119S, Stainless SS304, 1.25x1.25 with Integral Tanks
771641
Impeller 503, Composite, 4.18", 0.5 HP
4310560
Impeller 503, Composite, 4.34", 0.75 HP
4310561
Impeller 503, Composite, 4.50", 1.0 HP
4310562
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













