

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Advantage Temperature Controller SRV-1620
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Initial Equipment Check
Unboxing and Initial Inspection
Unbox the unit before accepting delivery
Check for visible damage
Documentation of Damage
Is there any suspected damage?
Take photographs of any suspected damage
Describe the suspected damage in detail
Follow proper procedures for damage claims
Keep detailed records of the damage and claims process
Heater Contactor and Pump Motor Starter Inspection
Heater Contactor Inspection
Inspect the heater contactor for signs of wear or pitting on the contacts.
Is the heater contactor cycling proportionally to the heat input required?
Replace the heater contactor if wear or pitting is observed.
Pump Motor Starter Inspection
Inspect the pump motor starter for signs of wear or pitting on the contacts.
Replace the pump motor starter if wear or pitting is observed.
Safety and Final Checks
Ensure all components are not overheating.
Heater Replacement
Preparation
Disengage operations and ensure all system pressure is relieved
Verify the unit’s pressure gauges read '0'
Disengage main power supply
Verify the Power light on the display is 'off'
Access and Drainage
Remove the lift-off access panel and set aside
Drain machine by removing the pump casing drain plug
Heater Disconnection
Pressure Switch Maintenance
Preparation
Shut down unit operations according to section 3.4 in the manual
Ensure proper lock-out procedures are followed
Is the system pressure eliminated and the unit’s pressure gauges reading '0' pressure?
Pressure Switch Replacement
Drain unit by removing the pump casing drain plug
Remove the capillary connection from the cooling cylinder to the pressure switch
Remove the brass elbow mounted on the pressure switch
Remove the electrical connections to the pressure switch
Cooling Valve Maintenance
Preparation
Disengage process operations according to the procedure outlined in section 3.4.
Ensure coolant pressure gauge reads '0'.
Shut off water system flow.
Power Supply Disengagement
Disengage main power supply.
Follow all lockout/tagout procedures.
Accessing the Solenoid Valve
Remove or open any access cover panel and set aside.
Access the parts list for your equipment in MaintainX.
Case 119, Iron, 1.25x1.25 with Integral Tanks
771640
Case 119S, Stainless SS304, 1.25x1.25 with Integral Tanks
771641
Impeller 503, Composite, 4.18", 0.5 HP
4310560
Impeller 503, Composite, 4.34", 0.75 HP
4310561
Impeller 503, Composite, 4.50", 1.0 HP
4310562
Case 119, Iron, 1.25x1.25 with Integral Tanks
771640
Case 119S, Stainless SS304, 1.25x1.25 with Integral Tanks
771641
Impeller 503, Composite, 4.18", 0.5 HP
4310560
Impeller 503, Composite, 4.34", 0.75 HP
4310561
Impeller 503, Composite, 4.50", 1.0 HP
4310562
Case 119, Iron, 1.25x1.25 with Integral Tanks
771640
Case 119S, Stainless SS304, 1.25x1.25 with Integral Tanks
771641
Impeller 503, Composite, 4.18", 0.5 HP
4310560
Impeller 503, Composite, 4.34", 0.75 HP
4310561
Impeller 503, Composite, 4.50", 1.0 HP
4310562
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













