

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Advantage Temperature Controller SRG-620
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Heater Replacement
Preparation
Disengage operations and ensure all system pressure is relieved and the unit’s pressure gauges read '0'.
Disengage main power supply and verify the Power light on the display is 'off'.
Access and Drainage
Remove the lift-off access panel and set aside.
Drain machine by removing the pump casing drain plug.
Heater Disconnection
Remove heater’s junction box cover to locate wiring connections.
Note the wiring connections for correct reinstallation.
Sensor Probe Maintenance
Temperature Probe Overview
Describe the function of the temperature probe
Verify automatic gain calibration within the controller electronics
Locate the zero adjustment potentiometer on the CPU
Sensor Probe Error Indication
Is the sensor probe error indicated by three dashed lines on the temperature display?
Reconnection Procedure
Unplug the service connection
Shake out any water from the connection
Heater Contactor and Pump Motor Starter Inspection
Heater Contactor Inspection
Inspect the heater contactor for signs of wear or pitting
Is the heater contactor cycling frequently?
Replace the heater contactor if wear or pitting is observed
Pump Motor Starter Inspection
Inspect the pump motor starter for signs of wear or pitting
Replace the pump motor starter if wear or pitting is observed
Safety and Final Checks
Ensure all components are not overheating
Voltage Change
Consult with Advantage Service Department
Select conversion type
Prepare for field voltage changeover
Check items for replacement or rewiring
Perform field voltage changeover
Disengage operations and verify system pressure is relieved
Disengage main power supply
Gain access to the electrical panel
Rewire the heater to the new voltage
Pressure Switch Maintenance
Preparation
Shut down unit operations according to section 3.4 in the manual
Ensure proper lock-out procedures are followed
Is the system pressure eliminated and the unit’s pressure gauges reading '0' pressure?
Pressure Switch Replacement
Drain unit by removing the pump casing drain plug
Remove the capillary connection from the cooling cylinder to the pressure switch
Remove the brass elbow mounted on the pressure switch
Remove the electrical connections to the pressure switch
Access the parts list for your equipment in MaintainX.
Valve
8764939
Case 119, Iron, 1.25x1.25 with Integral Tanks
771640
Case 119S, Stainless SS304, 1.25x1.25 with Integral Tanks
771641
Impeller 503, Composite, 4.18", 0.5 HP
4310560
Impeller 503, Composite, 4.34", 0.75 HP
4310561
Valve
8764939
Case 119, Iron, 1.25x1.25 with Integral Tanks
771640
Case 119S, Stainless SS304, 1.25x1.25 with Integral Tanks
771641
Impeller 503, Composite, 4.18", 0.5 HP
4310560
Impeller 503, Composite, 4.34", 0.75 HP
4310561
Valve
8764939
Case 119, Iron, 1.25x1.25 with Integral Tanks
771640
Case 119S, Stainless SS304, 1.25x1.25 with Integral Tanks
771641
Impeller 503, Composite, 4.18", 0.5 HP
4310560
Impeller 503, Composite, 4.34", 0.75 HP
4310561
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













