

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Advantage Temperature Controller SRG-1635
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Heater Replacement
Preparation
Disengage operations and ensure all system pressure is relieved
Verify the unit’s pressure gauges read '0'
Disengage main power supply
Verify the Power light on the display is 'off'
Access and Drainage
Remove the lift-off access panel and set aside
Drain machine by removing the pump casing drain plug
Heater Disconnection
Pressure Switch Maintenance
Preparation
Shut down unit operations according to section 3.4 in the manual
Ensure proper lock-out procedures are followed
Is the system pressure eliminated and the unit’s pressure gauges reading '0' pressure?
Pressure Switch Replacement
Drain unit by removing the pump casing drain plug
Remove the capillary connection from the cooling cylinder to the pressure switch
Remove the brass elbow mounted on the pressure switch
Remove the electrical connections to the pressure switch
Cooling Valve Maintenance
Preparation
Disengage process operations and verify all system pressure is relieved and the unit’s pressure gauges read '0'.
Disengage main power supply and verify the Power light on the display is 'off'.
Remove the lift-off access panel and set aside.
Disconnect the valve wiring harness.
Remove the AVTTM valve’s drip cover.
Motor/Gearbox Service
Remove the 2 mounting screws securing the motor/gearbox assembly.
Carefully separate the motor/gearbox from the attached coupling from the valve assembly.
Pump Seal Replacement
Preparation
Disengage process operations and relieve all system pressure
Disengage main power supply and verify the Power light on the display is 'off'
Accessing the Pump
Remove the lift-off access panel and set aside
Remove the necessary panels to gain access to the pump motor
Draining and Disconnecting
Drain machine by removing the pump casing drain plug
Remove the three motor wire leads from the motor wiring terminals and map the wire terminal locations
Heater Contactor and Pump Motor Starter Inspection
Heater Contactor Inspection
Inspect heater contactor for signs of wear or pitting
Is the heater contactor cycling frequently?
Does the heater contactor require replacement due to wear?
Pump Motor Starter Inspection
Inspect pump motor starter for signs of wear or pitting
Does the pump motor starter require replacement due to wear?
Safety and Maintenance
Ensure all components are cool before inspection
Access the parts list for your equipment in MaintainX.
Valve
8764939
Case 119, Iron, 1.25x1.25 with Integral Tanks
771640
Case 119S, Stainless SS304, 1.25x1.25 with Integral Tanks
771641
Impeller 503, Composite, 4.18", 0.5 HP
4310560
Impeller 503, Composite, 4.34", 0.75 HP
4310561
Valve
8764939
Case 119, Iron, 1.25x1.25 with Integral Tanks
771640
Case 119S, Stainless SS304, 1.25x1.25 with Integral Tanks
771641
Impeller 503, Composite, 4.18", 0.5 HP
4310560
Impeller 503, Composite, 4.34", 0.75 HP
4310561
Valve
8764939
Case 119, Iron, 1.25x1.25 with Integral Tanks
771640
Case 119S, Stainless SS304, 1.25x1.25 with Integral Tanks
771641
Impeller 503, Composite, 4.18", 0.5 HP
4310560
Impeller 503, Composite, 4.34", 0.75 HP
4310561
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













