Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Advantage Temperature Control Unit SK-1045
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Sensor Probe Maintenance
Reconnection Procedure
Unplug the sensor probe connection
Shake out water from the service connection
Replug the sensor probe connection
Did the error display change to Solid Red?
Press the Start push button to clear the error display
Replacement Procedure
Stop process operations as described in section 3.4 of the manual
Ensure all process pressure is relieved and pressure gauges read '0' pressure
Instrument Controller Maintenance
Preparation
Disengage process operations according to the procedure outlined in section 3.4.
Ensure all system pressure is relieved and the unit's pressure gauges read '0'.
Power Disconnection
Disengage main power supply.
Verify the Power light on the display is 'off'.
Panel Removal
Remove the thermoformed front panel and set aside.
Count the screws removed from the front panel.
Cooling Valve Maintenance
Initial Safety and Preparation
Disengage process operations and verify all system pressure is relieved and the unit's pressure gauges read '0'.
Disengage main power supply and verify the Power light on the display is 'off'.
Remove the lift-off access panel and set aside.
Disconnect the valve wiring harness.
Remove the AVT valve's drip cover.
Motor/Gearbox Assembly Service
Remove the 2 mounting screws securing the motor/gearbox assembly to the valve bracket.
Remove the 2 screws securing the micro switch to completely remove the motor.
Pressure Switch Maintenance
Preparation and Safety
Become familiar with the manual and operating characteristics of the equipment.
Ensure proper operator training, installation, operation, and maintenance of the water temperature controller.
Follow proper lock-out procedures and ensure system pressure is eliminated.
Pressure Switch Replacement
Shut down unit operations according to section 3.4 in the manual.
Ensure the unit's pressure gauges read '0' pressure.
Drain unit by removing the pump casing drain plug.
Remove the capillary connection from the cooling cylinder to the pressure switch.
Voltage Change
Preparation
Disengage process operations and verify all system pressure is relieved and the unit's pressure gauges read '0'.
Disengage main power supply and follow proper lock-out procedures.
Verify the Power light on the display is 'off'.
Access Panels
Remove the lift-off access panel and set aside.
Remove the thermoformed front panel and open the electrical cabinet panel door.
Unplug the instrument connectors to fully extend the hinged panel.
Rewiring
Access the parts list for your equipment in MaintainX.
Motor/Pump Assembly AS5 1HP AS5 2/4/3/60
6207010
Impeller B2-5264 4.75" AS5
4310603
Motor AE5/AS5/A5W 1HP #S-2773R
4757863
Adapter - iron C2-4551 AS5
414
Pump case - iron D2-1839 AS5
771599
Motor/Pump Assembly AS5 1HP AS5 2/4/3/60
6207010
Impeller B2-5264 4.75" AS5
4310603
Motor AE5/AS5/A5W 1HP #S-2773R
4757863
Adapter - iron C2-4551 AS5
414
Pump case - iron D2-1839 AS5
771599
Motor/Pump Assembly AS5 1HP AS5 2/4/3/60
6207010
Impeller B2-5264 4.75" AS5
4310603
Motor AE5/AS5/A5W 1HP #S-2773R
4757863
Adapter - iron C2-4551 AS5
414
Pump case - iron D2-1839 AS5
771599
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX