

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Advantage Temperature Control Unit SK-1620
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Instrument Controller Maintenance
Preparation
Disengage process operations according to the procedure outlined in section 3.4
Ensure all system pressure is relieved and the unit's pressure gauges read '0'
Disengage main power supply and verify the Power light on the display is 'off'
Panel and Instrument Removal
Remove the thermoformed front panel and set aside
Open the hinged electrical cabinet panel cover
Disconnect electrical connections
Remove the four mounting nuts to loosen the instrument
Voltage Change
Preparation
Disengage process operations and verify all system pressure is relieved and the unit's pressure gauges read '0'.
Disengage main power supply and follow proper lock-out procedures.
Verify the Power light on the display is 'off'.
Access Panels
Remove the lift-off access panel and set aside.
Remove the thermoformed front panel and open the electrical cabinet panel door.
Unplug the instrument connectors to fully extend the hinged panel.
Rewiring and Replacement
1 Yearly Probe Calibration
Preparation
Disengage process operations and verify all system pressure is relieved and the unit's pressure gauges read '0'.
Disengage main power supply and verify the Power light on the display is 'off'.
Probe Removal and Replacement
Remove the 'To Process' temperature probe and insert a 1/2" plug in its place.
Ice Water Bath Preparation
Prepare an ice water bath.
Record the temperature of the ice water bath using an accurate digital thermometer.
Calibration Procedure
Cooling Valve Maintenance
Initial Safety and Preparation
Disengage process operations and verify all system pressure is relieved and the unit's pressure gauges read '0'.
Disengage main power supply and verify the Power light on the display is 'off'.
Access and Disconnect
Remove the lift-off access panel and set aside.
Disconnect the valve wiring harness.
Remove the AVT valve's drip cover.
Motor/Gearbox Service
Remove the 2 mounting screws securing the motor/gearbox assembly to the valve bracket.
Pressure Switch Maintenance
Preparation and Safety
Familiarize with the manual and operating characteristics of the equipment
Ensure proper operator training, installation, operation, and maintenance
Follow safety considerations and lock-out procedures
Is the system pressure eliminated and the unit's pressure gauges read '0' pressure?
Pressure Switch Replacement
Shut down unit operations according to section 3.4 in the manual
Drain unit by removing the pump casing drain plug
Remove the capillary connection from the cooling cylinder to the pressure switch
Access the parts list for your equipment in MaintainX.
Motor/Pump Assembly 1/2HP AS5 2/4/3/60
6206995
Impeller B2-5264 4.37" AS5
4310601
Motor AE5/AS5/A5W 1HP #S-2771R
4757861
Adapter - iron C2-4551 AS5
414
Pump case - iron D2-1839 AS5
771599
Motor/Pump Assembly 1/2HP AS5 2/4/3/60
6206995
Impeller B2-5264 4.37" AS5
4310601
Motor AE5/AS5/A5W 1HP #S-2771R
4757861
Adapter - iron C2-4551 AS5
414
Pump case - iron D2-1839 AS5
771599
Motor/Pump Assembly 1/2HP AS5 2/4/3/60
6206995
Impeller B2-5264 4.37" AS5
4310601
Motor AE5/AS5/A5W 1HP #S-2771R
4757861
Adapter - iron C2-4551 AS5
414
Pump case - iron D2-1839 AS5
771599
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













