

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Advantage Temperature Controller SRG-1080
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Temperature Probe Calibration
Equipment Needed
Ensure all necessary equipment is available
Setup
Disengage process operations according to the unit manual
Disengage main power supply
Remove the 'to process' temperature probe and insert a ½” plug
Prepare an ice bath and place a digital thermometer in it
Place the probe in the ice bath
Procedure
Voltage Change
Pre-Conversion Consultation
Consult with Advantage Service Department to determine if unit can be converted. Record details of the consultation.
Enter the Serial Number of the unit.
Call 317-887-0729 for consultation.
Typical Conversions
Select the conversion type
Consult factory for other power conversions and record details.
Items Requiring Replacement or Rewiring
Identify items for replacement or rewiring
Initial Equipment Check
Pre-Delivery Inspection
Unbox the unit before accepting delivery
Check for visible damage
Document any evident damage on the delivery receipt
Decide on shipment acceptance
Post-Delivery Documentation
Take photographs of any suspected damage
Describe the suspected damage in detail
Follow proper procedures for damage claims
Heater Contactor and Pump Motor Starter Inspection
Heater Contactor Inspection
Inspect the heater contactor for signs of wear or pitting on the contacts.
Is the heater contactor cycling proportionally to the heat input required?
Check for any signs of overheating in the heater contactor components.
Pump Motor Starter Inspection
Inspect the pump motor starter for signs of wear or pitting on the contacts.
Check for any signs of overheating in the pump motor starter components.
Post-Inspection Actions
Do the heater contactor or pump motor starter require replacement?
Cooling Valve Maintenance
Preparation
Disengage process operations and verify all system pressure is relieved and the unit’s pressure gauges read '0'.
Disengage main power supply and verify the Power light on the display is 'off'.
Remove the lift-off access panel and set aside.
Disconnect the valve wiring harness.
Remove the AVTTM valve’s drip cover.
Motor/Gearbox Service
Remove the 2 mounting screws securing the motor/gearbox assembly.
Carefully separate the motor/gearbox from the attached coupling from the valve assembly.
Access the parts list for your equipment in MaintainX.
Valve
8764939
Case 119, Iron, 1.25x1.25 with Integral Tanks
771640
Case 119S, Stainless SS304, 1.25x1.25 with Integral Tanks
771641
Impeller 503, Composite, 4.18", 0.5 HP
4310560
Impeller 503, Composite, 4.34", 0.75 HP
4310561
Valve
8764939
Case 119, Iron, 1.25x1.25 with Integral Tanks
771640
Case 119S, Stainless SS304, 1.25x1.25 with Integral Tanks
771641
Impeller 503, Composite, 4.18", 0.5 HP
4310560
Impeller 503, Composite, 4.34", 0.75 HP
4310561
Valve
8764939
Case 119, Iron, 1.25x1.25 with Integral Tanks
771640
Case 119S, Stainless SS304, 1.25x1.25 with Integral Tanks
771641
Impeller 503, Composite, 4.18", 0.5 HP
4310560
Impeller 503, Composite, 4.34", 0.75 HP
4310561
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













