Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Advantage Temperature Controller SRG-680
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Pressure Switch Maintenance
Preparation
Shut down unit operations according to section 3.4 in the manual
Ensure proper lock-out procedures are followed
Is the system pressure eliminated and the unit’s pressure gauges reading '0' pressure?
Pressure Switch Replacement
Drain unit by removing the pump casing drain plug
Remove the capillary connection from the cooling cylinder to the pressure switch
Remove the brass elbow mounted on the pressure switch
Remove the electrical connections to the pressure switch
Heater Replacement
Preparation
Disengage operations and ensure all system pressure is relieved
Verify the unit’s pressure gauges read '0'
Disengage main power supply
Verify the Power light on the display is 'off'
Access and Drainage
Remove the lift-off access panel and set aside
Drain machine by removing the pump casing drain plug
Heater Disconnection
Voltage Change
Pre-Conversion Consultation
Consult with Advantage Service Department to determine if unit can be converted. Record details of the consultation.
Record Serial Number and call 317-887-0729 for conversion eligibility.
Typical Conversions
Select the conversion type
Consult factory for other power conversions and record details.
Items Requiring Replacement or Rewiring
Identify items for replacement or rewiring
Field Voltage Changeover Procedure
Cooling Valve Maintenance
Preparation
Disengage process operations and verify all system pressure is relieved and the unit’s pressure gauges read '0'.
Disengage main power supply and verify the Power light on the display is 'off'.
Remove the lift-off access panel and set aside.
Disconnect the valve wiring harness.
Remove the AVTTM valve’s drip cover.
Motor/Gearbox Service
Remove the 2 mounting screws securing the motor/gearbox assembly.
Carefully separate the motor/gearbox from the attached coupling from the valve assembly.
Temperature Probe Calibration
Equipment Needed
Ensure all necessary equipment is available
Setup
Disengage process operations according to the unit manual and ensure all system pressure is relieved.
Disengage main power supply.
Remove the 'to process' temperature probe and insert a ½” plug in its place.
Prepare an ice bath and place a digital thermometer in it.
Calibration Procedure
Restart the instrument according to the unit manual.
Access the parts list for your equipment in MaintainX.
Valve
8764939
Case 119, Iron, 1.25x1.25 with Integral Tanks
771640
Case 119S, Stainless SS304, 1.25x1.25 with Integral Tanks
771641
Impeller 503, Composite, 4.18", 0.5 HP
4310560
Impeller 503, Composite, 4.34", 0.75 HP
4310561
Valve
8764939
Case 119, Iron, 1.25x1.25 with Integral Tanks
771640
Case 119S, Stainless SS304, 1.25x1.25 with Integral Tanks
771641
Impeller 503, Composite, 4.18", 0.5 HP
4310560
Impeller 503, Composite, 4.34", 0.75 HP
4310561
Valve
8764939
Case 119, Iron, 1.25x1.25 with Integral Tanks
771640
Case 119S, Stainless SS304, 1.25x1.25 with Integral Tanks
771641
Impeller 503, Composite, 4.18", 0.5 HP
4310560
Impeller 503, Composite, 4.34", 0.75 HP
4310561
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX