

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Advantage Temperature Controller SRV-665
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Pump Seal Replacement
Preparation
Disengage process operations and relieve all system pressure.
Disengage main power supply.
Verify the Power light on the display is “off”.
Accessing the Pump
Remove the lift-off access panel and set aside.
Remove the necessary panels to gain access to the pump motor.
Draining and Disconnecting
Drain machine by removing the pump casing drain plug.
Pressure Switch Maintenance
Pressure Switch Maintenance Overview
Understanding the Pressure Switch
Verify the pressure switch is mounted at the bottom of the electrical cabinet.
Is the pressure switch factory set to 20 psi?
Pre-Replacement Checks
Is the water supply pressure sufficient as indicated by the unit’s pressure gauges?
Is the pump 'off'?
Does the pressure switch fail to close despite sufficient pressure?
Pressure Switch Replacement Procedure
Heater Replacement
Preparation
Disengage operations and ensure all system pressure is relieved
Ensure the unit’s pressure gauges read '0'
Disengage main power supply
Verify the Power light on the display is 'off'
Access and Drainage
Remove the lift-off access panel and set aside
Drain machine by removing the pump casing drain plug
Heater Disconnection
Cooling Valve Maintenance
Preparation
Disengage process operations according to the procedure outlined in section 3.4.
Ensure coolant pressure gauge reads '0'.
Shut off water system flow.
Safety Measures
Disengage main power supply.
Follow all lockout/tagout procedures.
Accessing the Solenoid Valve
Remove or open any access cover panel and set aside to gain access to the make-up solenoid valve.
Heater Contactor and Pump Motor Starter Inspection
Heater Contactor Inspection
Inspect the heater contactor for signs of wear or pitting
Is the heater contactor cycling frequently?
Replace the heater contactor if wear or pitting is observed
Pump Motor Starter Inspection
Inspect the pump motor starter for signs of wear or pitting
Replace the pump motor starter if wear or pitting is observed
Safety and Final Checks
Ensure all components are not overheating
Access the parts list for your equipment in MaintainX.
Case 119, Iron, 1.25x1.25 with Integral Tanks
771640
Case 119S, Stainless SS304, 1.25x1.25 with Integral Tanks
771641
Impeller 503, Composite, 4.18", 0.5 HP
4310560
Impeller 503, Composite, 4.34", 0.75 HP
4310561
Impeller 503, Composite, 4.50", 1.0 HP
4310562
Case 119, Iron, 1.25x1.25 with Integral Tanks
771640
Case 119S, Stainless SS304, 1.25x1.25 with Integral Tanks
771641
Impeller 503, Composite, 4.18", 0.5 HP
4310560
Impeller 503, Composite, 4.34", 0.75 HP
4310561
Impeller 503, Composite, 4.50", 1.0 HP
4310562
Case 119, Iron, 1.25x1.25 with Integral Tanks
771640
Case 119S, Stainless SS304, 1.25x1.25 with Integral Tanks
771641
Impeller 503, Composite, 4.18", 0.5 HP
4310560
Impeller 503, Composite, 4.34", 0.75 HP
4310561
Impeller 503, Composite, 4.50", 1.0 HP
4310562
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













