MaintainX Asset Hub logo
EnterprisePricing
Wilo

Wilo Pump TOP-S80/20

Need answers fast?
Explore the manual using AI.

Wilo Pump TOP-S80/20
Wilo Pump TOP-S80/20

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Wilo Pump TOP-S80/20

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Wilo Pump TOP-S80/20

Wilo Pump TOP-S80/20

Create an account to install this asset package.

Maintenance Plans for Wilo Pump Model TOP-S80/20

Integrate maintenance plans directly into your work orders in MaintainX.

Motor Protection System Check

Check mark

Motor Protection System Check

Check mark

Verify terminal box type and corresponding protection mechanism

Check mark

Is the thermal tripping setting corresponding to the maximum current of the speed stage?

Check mark

Is the Wilo tripping unit SK 602(N)/SK 622(N) present?

Check mark

Is the thermal winding contact (WSK) connected to a motor protection system?

Check mark

Check if the motor has cooled down before resetting

Check mark

Reset the motor protection system if necessary

Run this procedureArrow right

Rotation Direction Check

Check mark

8.2 Rotation direction monitoring

Check mark

Verify the following conditions for three-phase pumps

Check mark

Is the direction of rotation light green when the pump is briefly switched on?

Check mark

If the direction of rotation is incorrect, was the pump electrically isolated and two phases interchanged in the terminal box before restarting?

Run this procedureArrow right

Frequency Converter Check

Check mark

Frequency converter operation

Check mark

Check the type of motor

Check mark

Verify the use of output filters

Check mark

Check the type of filters used for noise reduction

Check mark

Measure the rate of voltage rise (du/dt)

Check mark

Is the rate of voltage rise within the limit (du/dt < 500 V/μs)?

Check mark

Measure the voltage spikes (û)

Check mark

Are the voltage spikes within the limit (û < 650 V)?

Check mark

Measure the minimum voltage at connection terminals (Umin)

Run this procedureArrow right

Pump Startup Check

Check mark

8 Commissioning

Check mark

Verify installation and connection

Check mark

Is the sealing screw including the flat gasket in place?

Check mark

Prime and vent the unit correctly

Check mark

Is the pump rotor compartment vented automatically after a short operating period?

Check mark

Is dry running for short periods acceptable?

Check mark

Ensure motor head, differential pressure screw, and flange connection/threaded pipe union are not removed for venting

Run this procedureArrow right

Motor Maintenance

Check mark

9.1 Dismantling/installation of the motor

Check mark

Read the chapters 'Dismantling/installation of the motor' and 'Decommissioning' before maintenance

Check mark

Comply with safety instructions in chapters 2.6, 7, and 8

Check mark

Close existing check valves on both sides of the pump

Check mark

Allow the pump to cool to room temperature

Check mark

Drain the isolated branch of the system

Check mark

Are check valves fitted?

Check mark

Drain the entire system if no check valves are fitted

Check mark

Observe manufacturer's information and safety data sheets on possible additives

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Wilo

Explore Other Assets