Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Wilo Pump TOP-S80/20
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Motor Protection System Check
Motor Protection System Check
Verify terminal box type and corresponding protection mechanism
Is the thermal tripping setting corresponding to the maximum current of the speed stage?
Is the Wilo tripping unit SK 602(N)/SK 622(N) present?
Is the thermal winding contact (WSK) connected to a motor protection system?
Check if the motor has cooled down before resetting
Reset the motor protection system if necessary
Rotation Direction Check
8.2 Rotation direction monitoring
Verify the following conditions for three-phase pumps
Is the direction of rotation light green when the pump is briefly switched on?
If the direction of rotation is incorrect, was the pump electrically isolated and two phases interchanged in the terminal box before restarting?
Frequency Converter Check
Frequency converter operation
Check the type of motor
Verify the use of output filters
Check the type of filters used for noise reduction
Measure the rate of voltage rise (du/dt)
Is the rate of voltage rise within the limit (du/dt < 500 V/μs)?
Measure the voltage spikes (û)
Are the voltage spikes within the limit (û < 650 V)?
Measure the minimum voltage at connection terminals (Umin)
Pump Startup Check
8 Commissioning
Verify installation and connection
Is the sealing screw including the flat gasket in place?
Prime and vent the unit correctly
Is the pump rotor compartment vented automatically after a short operating period?
Is dry running for short periods acceptable?
Ensure motor head, differential pressure screw, and flange connection/threaded pipe union are not removed for venting
Motor Maintenance
9.1 Dismantling/installation of the motor
Read the chapters 'Dismantling/installation of the motor' and 'Decommissioning' before maintenance
Comply with safety instructions in chapters 2.6, 7, and 8
Close existing check valves on both sides of the pump
Allow the pump to cool to room temperature
Drain the isolated branch of the system
Are check valves fitted?
Drain the entire system if no check valves are fitted
Observe manufacturer's information and safety data sheets on possible additives
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX