Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Wilo Pump TOP-S40/4
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Pump Leak Check
7.1 Installation
Check for leaks after installation
Periodically verify all connections remain leak-free during operation
Ensure leakages of hazardous fluids are removed to prevent danger to persons or the environment
Rotation Direction Check
8.2 Rotation direction monitoring
Verify the following conditions for three-phase pumps
Briefly switch the pump on to check the direction of rotation
Is the direction of rotation correct (green light)?
Does the motor's direction of rotation correspond to the direction of rotation arrow on the rating plate?
If the direction of rotation is incorrect
Electrically isolate the pump
Interchange 2 phases in the terminal box
Restart the pump
Pump Startup Check
8 Commissioning
Check that the pump is installed and connected correctly
Ensure the sealing screw and flat gasket are in place
Prime the unit correctly
Verify that the pump rotor compartment is vented automatically
Confirm that the motor head, differential pressure screw, and flange connection/threaded pipe union are not removed for venting
Frequency Converter Check
7.2.3 Frequency converter operation
Verify the use of output filters
Measure the rate of voltage rise (du/dt)
Is the rate of voltage rise within compliance (du/dt < 500 V/μs)?
Measure the voltage spikes (û)
Are the voltage spikes within compliance (û < 650 V)?
Measure the minimum voltage at connection terminals (Umin)
Is the minimum voltage at connection terminals compliant (Umin ≥ 150 V)?
Measure the minimum frequency at connection terminals (fmin)
Motor Maintenance
9.1 Dismantling/installation of the motor
Read relevant chapters before maintenance
Comply with safety instructions
Close check valves on both sides of the pump
Allow pump to cool to room temperature
Drain the isolated branch of the system
Drain the entire system if no check valves are fitted
Observe manufacturer's information and safety data sheets on additives
Comply with national regulations for accident prevention
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX